Filter by category
Filter by Date
[EventId:202] AP ENDED for ENERGY in NSW1 at 14 May 2024 03:55
Issued by Australian Energy Market Operator Ltd at 0355 hrs on 13 May 2024
ADMINISTERED PRICE PERIOD ENDS in NSW1 region.
In accordance with Clause 3.14.2(b) of the National Electricity Rules, AEMO is notifying market participants that the administered price period declared for the NSW1 region in market notice 116604 will end at 0400 hrs on 14 May 2024.
This is an AEMO autogenerated Market Notice.
RESERVE NOTICE MT PASA PUBLICATION 14 May 2024
-- May 2025 - May 2026 in New South Wales.
AEMO declares low reserve conditions in accordance with clause 4.8.4 of the National Electricity Rules for the following region(s) and periods:
-- November 2025 - March 2026 in New South Wales when forecast demand exceeds supply under some circumstances.
Please note that MTPASA informs the market of potential reliability issues to allow the market to respond in the first instance, potentially avoiding the need for any AEMO intervention.
For further information, please refer to:
https://www.aemo.com.au/Electricity/National-Electricity-Market-NEM/Data/Market-Management-System-MMS/Projected-Assessment-of-System-Adequacy
This notice supersedes Market Notice 116498 published on 7 May 2024.
Background
As part of a broader process of implementing the reliability standard, AEMO runs the Medium Term Projected Assessment of System Adequacy (MTPASA) process weekly to forecast expected unserved energy levels over a two year period. If the expected annual unserved energy exceeds the maximum level specified by the Reliability Standard, a Low Reserve Condition is identified.
For more information about how AEMO implements the reliability standard, please view the Reliability Standard Implementation Guidelines (RSIG) available on AEMO's website at https://www.aemo.com.au/Electricity/National
Forecasting
AEMO
[EventId:202] AP STARTED for ENERGY in NSW1 at 13 May 2024 03:55
Issued by Australian Energy Market Operator Ltd at 0355 hrs on 13 May 2024
ADMINISTERED PRICE PERIOD DECLARED in NSW1 region.
AEMO has determined that the rolling sum of the uncapped spot prices for the NSW1 region over the previous 2016 trading intervals has exceeded the cumulative price threshold (CPT) of $1,490,200.00.
In accordance with Clause 3.14.2(b) of the National Electricity Rules, AEMO has determined that an administered price period will commence at the trading interval starting 0405 hrs on 13 May 2024 and will continue through to the end of that trading day.
An administered price cap (APC) of 600 $/MWh will apply to all trading intervals during this administered price period. This APC will apply to spot prices and to all market ancillary service prices in the NSW1 region.
An administered floor price (AFP) of -600 $/MWh will apply to spot prices.
AEMO will continue to monitor the rolling sum of the uncapped spot prices and issue further Market Notices as required.
This is an AEMO autogenerated Market Notice.
[EventId:201] AP ENDED for ENERGY in NSW1 at 13 May 2024 03:55
Issued by Australian Energy Market Operator Ltd at 0355 hrs on 12 May 2024
ADMINISTERED PRICE PERIOD ENDS in NSW1 region.
In accordance with Clause 3.14.2(b) of the National Electricity Rules, AEMO is notifying market participants that the administered price period declared for the NSW1 region in market notice 116591 will end at 0400 hrs on 13 May 2024.
This is an AEMO autogenerated Market Notice.
Cancellation: Reclassification of non-credible contingency event due to existence of widespread abnormal condition - NEM regions.
AEMO considers the occurrence of a non-credible contingency event due to the widespread abnormal conditions advised in AEMO Electricity Market Notice 116572 is no longer reasonably possible and accordingly its classification has reverted to non-credible.
Cancellation time: 1115 hrs 13/05/2024.
Manager NEM Real Time Operations
Cancellation - Possible intervention to manage power system security in SA region 13/05/2024
Cancellation - Possible intervention to manage power system security in SA region 13/05/2024
Refer Market Notice 116592
AEMO no longer foresees a possible requirement for intervention to manage power system security in SA region. The advice of possible intervention is cancelled from 1405 hrs 12/05/2024.
Manager NEM Real Time Operations
Cancellation - AEMO Intervention Event - Intervention trading intervals - Direction SA region 11/05/2024
Cancellation - AEMO Intervention Event - Intervention trading intervals - Direction SA region 11/05/2024
Refer Market Notice 116587
The AEMO Intervention Event and all associated directions are cancelled from 1600 hrs 12/05/2024
Manager NEM Real Time Operations
CHG0088824 | Completed | Production | NEM Reform IESS Retail MSATS 53.0 Release
Notification issued to: Market Notice
Notification Type: Completed
Change Type: Normal
Service/Component: MSATS - Consumer Administration and Transfer Solution(CATS)
Change Title: NEM Reform IESS Retail MSATS 53.0 Release
Support Information: Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
Cancellation of a Non-Credible Contingency Event: Armidale - Dumaresq 8C 330kV line and Armidale - Sapphire WF 8E 330kV line in NSW1 due to Lightning.
Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: NSW1
Lines: Armidale - Dumaresq 8C 330kV and Armidale - Sapphire WF 8E 330kV
Cancellation time: 12/05/2024 10:54
Constraint set(s) revoked:
N-ARDM_ARSR_1PH_N-2 Constraint set contains the following interconnector(s) on the left hand side:
N-Q-MNSP1
NSW1-QLD1
Refer AEMO Electricity Market Notice 116593
Auto-generated on behalf of Manager NEM Real Time Operations