Filter by category
Filter by Date
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 10/03/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following Period:
[1.] From 1830 hrs 10/03/2024 to 1900 hrs 10/03/2024.
The forecast capacity reserve requirement is 600 MW.
The minimum capacity reserve available is 575 MW.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 10/03/2024
The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 115566 is cancelled at 1940 hrs 09/03/2024.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 10/03/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following Period:
[1.] From 1830 hrs 10/03/2024 to 1900 hrs 10/03/2024.
The forecast capacity reserve requirement is 600 MW.
The minimum capacity reserve available is 599 MW.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 14/03/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
[1.] From 1800 hrs 14/03/2024 to 1830 hrs 14/03/2024.
The forecast capacity reserve requirement is 1780 MW.
The minimum capacity reserve available is 1493 MW.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - South Pine SVC - QLD region - 08/03/2024
Inter-regional transfer limit variation - South Pine SVC - QLD region - 08/03/2024
At 1605 hrs 08/03/2024 there was an unplanned outage of South Pine SVC.
The following constraint set(s) invoked at 1610 hrs 08/03/2024
Q-SP_VC
This constraint set(s) contains equations with the following interconnectors on the LHS.
NSW1-QLD1,N-Q-MNSP1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Moorabool Sydenham No2 500 kV line - Vic region - 06/03/2024
At 1210 hrs 06/03/2024 in the Victoria region, the Moorabool Sydenham No2 500 kV line returned to service on temporary towers.
Constraint set changes.
Revoked:
V-MLSY_NOEMTT_R
This constraint set(s) contains equations with the following interconnectors on the LHS.
T-V-MNSP1
V-SA
V-S-MNSP1
VIC1- NSW1
Refer Market Notices 114577, 114768, 114686, 114770 and 115120.
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Cancellation - Inter-regional transfer limit variation - constraint automation to manage Power System Security in NSW region - 29/12/2023
Cancellation - Inter-regional transfer limit variation - constraint automation to manage Power System Security in NSW region - 29/12/2023
Refer AEMO Electricity Market Notice 115398.
Constraint set CA_BRIS_54F2D1C0 revoked 1710 hrs.
This constraint set contains equations with the following interconnector on the LHS;
VIC1-NSW1
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Para - Roseworthy 132 kV Line - SA region - 01/03/2024
Inter-regional transfer limit variation - Para - Roseworthy 132 kV Line - SA region - 01/03/2024
At 1515 hrs 01/03/2024 there was a short notice outage of Para - Roseworthy 132 kV Line.
The following constraint set was invoked at 1530 hrs 01/03/2024
S-PARS
This constraint set contains equations with the following interconnectors on the LHS.
V-S-MNSP1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Mt Piper 500/330 kV TIE1 Transformer - NSW region - 01/03/2024
Inter-regional transfer limit variation - Mt Piper 500/330 kV TIE1 Transformer - NSW region - 01/03/2024
At 0747 hrs 01/03/2024 there was an unplanned outage of Mt Piper 500/330 kV TIE1 Transformer.
Constraint set(s) invoked: N-MPTX
The following constraint set(s) invoked at 0755 hrs 01/03/2024
N-MPTX
This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1,NSW1-QLD1,VIC1-NSW1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations