Filter by category
Filter by Date
[EventId:202411151330_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 15 November 2024 13:30
Issued by Australian Energy Market Operator Ltd at 1330 hrs on 15 November 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 15 November 2024.
Refer to market notice: 120485
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1330 hrs on 15 November 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202411151140_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 15 November 2024 11:40
Issued by Australian Energy Market Operator Ltd at 1140 hrs on 15 November 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 15 November 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1140 hrs on 15 November 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
Cancellation - AEMO Intervention Event - SA region 14/11/2024
Cancellation - AEMO Intervention Event - SA region 14/11/2024
Refer to Market Notice 120430
The AEMO Intervention Event and all associated directions are cancelled from 1630 hrs on 15/11/2024.
Manager NEM Real Time Operations
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Refer to Market Notice 120432
Direction is cancelled from: 1630 hrs 15/11/2024
Manager NEM Real Time Operations
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Refer to Market Notice 120444
Direction is cancelled from: 1430 hrs 15/11/2024
Manager NEM Real Time Operations
Cancellation: Direction issued to: Snowy Hydro Limited - MURR2-2 MURRAY2
Cancellation: Direction issued to: Snowy Hydro Limited - MURR2-2 MURRAY2
Refer to Market Notice 120473
Direction is cancelled from: 0800 hrs 15/11/2024
Manager NEM Real Time Operations
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 2330 hrs 15/11/2024.
The foreseeable circumstance requiring the need for intervention is Voltage.
Manager NEM Real Time Operations
Update Direction - EnergyAustralia Ecogen Pty Ltd - JLB02 JEERALANG B PO
Update Direction - EnergyAustralia Ecogen Pty Ltd - JLB02 JEERALANG B PO
Refer AEMO Electricity Participant Notice 120472
The JLB02 JEERALANG B PO direction is now expected to stay in place until 0900 hrs 15/11/2024.
The direction update is issued at 0645 hrs 15/11/2024.
Manager NEM Real Time Operations
Update Direction - EnergyAustralia Ecogen Pty Ltd - JLB01 JEERALANG B PO
Update Direction - EnergyAustralia Ecogen Pty Ltd - JLB01 JEERALANG B PO
Refer AEMO Electricity Participant Notice 120471
The JLB01 JEERALANG B PO direction is now expected to stay in place until 0900 hrs 15/11/2024.
The direction update is issued at 0645 hrs 15/11/2024.
Manager NEM Real Time Operations