115548MARKET SYSTEMS08/03/2024 04:36:50 PM

CHG0085747 | Completed | Pre-Production | Retail Pre-Production Data refresh (CATS and EMDM)

Change Number: CHG0085747

Notification issued to: Market Notice

Notification Type: Completed

Change Type: Normal

Service/Component: MSATS - Consumer Administration and Transfer Solution(CATS)
Change Title: Retail Pre-Production Data refresh (CATS and EMDM)
Support Information: Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
115547INTER-REGIONAL TRANSFER08/03/2024 04:16:46 PM

Inter-regional transfer limit variation - South Pine SVC - QLD region - 08/03/2024

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - South Pine SVC - QLD region - 08/03/2024

At 1605 hrs 08/03/2024 there was an unplanned outage of South Pine SVC.

The following constraint set(s) invoked at 1610 hrs 08/03/2024
Q-SP_VC

This constraint set(s) contains equations with the following interconnectors on the LHS.
NSW1-QLD1,N-Q-MNSP1

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations
115546GENERAL NOTICE08/03/2024 10:31:51 AM

NEM Local Temperature Alerts for SA, TAS, VIC from 08 Mar 2024 to 12 Mar 2024

AEMO ELECTRICITY MARKET NOTICE

AEMO's weather service provider has issued forecast temperatures equal to or greater than the NEM Local Temperature Alert Levels for listed weather stations below.

SA
Adelaide West Terrace (39+ Deg C): 9th Mar, 10th Mar
Mt Gambier Ap (39+ Deg C): 9th Mar, 11th Mar
Port Augusta Ap (39+ Deg C): 8th Mar, 9th Mar, 10th Mar, 11th Mar, 12th Mar

TAS
Launceston Ti Tree Bend (33+ Deg C): 10th Mar

VIC
Latrobe Valley Ap (39+ Deg C): 9th Mar, 10th Mar, 11th Mar
Mildura Ap (39+ Deg C): 9th Mar, 10th Mar, 11th Mar, 12th Mar
Mortlake (39+ Deg C): 9th Mar, 11th Mar

The NEM Local Temperature Alert Levels are:

Launceston Ti Tree Bend: 33 Deg C, Dalby Airport: 37 Deg C, for all other selected weather stations: 39 Deg C.

AEMO requests Market Participants to:

1. review the weather forecast in the local area where their generating units / MNSP converter stations are located and,

2. if required, update the available capacity in their dispatch offers or availability submissions consistent with the forecast temperatures.

Further information is available at:

https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-reliability/projected-assessment-of-system-adequacy/nem-local-temperature-alerts

AEMO Operations Planning
115545RECLASSIFY CONTINGENCY07/03/2024 04:59:50 PM

Cancellation of a Non-Credible Contingency Event: Collinsville - Stoney Creek 7306 132KV LINE line and Collinsville - Newlands 7121 132KV LINE line in QLD1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: QLD1

Lines: Collinsville - Stoney Creek 7306 132KV LINE and Collinsville - Newlands 7121 132KV LINE

Cancellation time: 07/03/2024 16:59

Constraint set(s) revoked:
NONE

Refer AEMO Electricity Market Notice 115543

Auto-generated on behalf of Manager NEM Real Time Operations
115544RECLASSIFY CONTINGENCY07/03/2024 04:34:50 PM

Cancellation of a Non-Credible Contingency Event: Bayswater - Mt Piper No.5A3 500kV line and Wollar - Mt Piper No.5A5 500kV line in NSW1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: NSW1

Lines: Bayswater - Mt Piper No.5A3 500kV and Wollar - Mt Piper No.5A5 500kV

Cancellation time: 07/03/2024 16:34

Constraint set(s) revoked:
NONE

Refer AEMO Electricity Market Notice 115534

Auto-generated on behalf of Manager NEM Real Time Operations
115543RECLASSIFY CONTINGENCY07/03/2024 03:57:40 PM

Reclassification of a Non-Credible Contingency Event: Collinsville - Stoney Creek 7306 132KV LINE line and Collinsville - Newlands 7121 132KV LINE line in QLD1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: QLD1

Lines: Collinsville - Stoney Creek 7306 132KV LINE and Collinsville - Newlands 7121 132KV LINE

Duration: 07/03/2024 15:57 until further notice

Constraint set(s) invoked:
NONE

Auto-generated on behalf of Manager NEM Real Time Operations
115542RECLASSIFY CONTINGENCY07/03/2024 03:34:51 PM

Cancellation of a Non-Credible Contingency Event: Armidale - Dumaresq 8C 330kV line and Armidale - Sapphire WF 8E 330kV line in NSW1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: NSW1

Lines: Armidale - Dumaresq 8C 330kV and Armidale - Sapphire WF 8E 330kV

Cancellation time: 07/03/2024 15:34

Constraint set(s) revoked:
N-ARDM_ARSR_1PH_N-2 Constraint set contains the following interconnector(s) on the left hand side:
N-Q-MNSP1
NSW1-QLD1


Refer AEMO Electricity Market Notice 115539

Auto-generated on behalf of Manager NEM Real Time Operations
115541MARKET INTERVENTION07/03/2024 03:15:20 PM

Cancellation - Possible intervention to manage power system security in South Australia (SA) region 07/03/2024

AEMO ELECTRICITY MARKET NOTICE

Cancellation - Possible intervention to manage power system security in South Australia (SA) region 07/03/2024

Refer Market Notice 115528

AEMO no longer foresees a possible requirement for intervention to manage power system security in SA region. The advice of possible intervention is cancelled from 1515 hrs 07/03/2024.

Manager NEM Real Time Operations
115540RECLASSIFY CONTINGENCY07/03/2024 02:44:50 PM

Cancellation of a Non-Credible Contingency Event: Bannaby - Mt Piper 5A6 500kV line and Bannaby - Mt Piper 5A7 500kV line in NSW1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: NSW1

Lines: Bannaby - Mt Piper 5A6 500kV and Bannaby - Mt Piper 5A7 500kV

Cancellation time: 07/03/2024 14:44

Constraint set(s) revoked:
N-5A6+5A7_N-2 Constraint set contains the following interconnector(s) on the left hand side:
N-Q-MNSP1
NSW1-QLD1
VIC1-NSW1


Refer AEMO Electricity Market Notice 115535

Auto-generated on behalf of Manager NEM Real Time Operations