Filter by category
Filter by Date
Non-credible contingency event - TAS region - 25/08/2024
Non-credible contingency event - TAS region - 25/08/2024
At 0850 hrs the New Norfolk A 110kV Bus tripped.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations
Inter-regional transfer limit variation -Redcliffs No 2 220 kV Bus - VIC region - 25/08/2024
Inter-regional transfer limit variation -Redcliffs No 2 220 kV Bus - VIC region - 25/08/2024
A planned outage of Redcliffs No 2 220 kV Bus in the VIC region was scheduled from 0630 hrs 25/08/2024 to 1730 hrs 25/08/2024.
The outage has been cancelled at 0805 hrs.
The following constraint set(s) were invoked
Constraint Sets: V-KMRC, V-RCTS220CAPAUTO
This constraint set(s) contains equations with the following interconnectors on the LHS.
V-S-MNSP1,T-V-MNSP1,V-SA,VIC1-NSW1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Dumaresq SVC - NSW region - 22/08/2024
Inter-regional transfer limit variation - Dumaresq SVC - NSW region - 22/08/2024
At 2238 hrs 22/08/2024 there was an unplanned of Dumaresq SVC
Constraint set(s) invoked: N-DM_SVC
The following constraint set(s) invoked at 2250 hrs 22/08/2024
N-DM_SVC
This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1,NSW1-QLD1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Kerang to Wemen 220kV line - VIC region - 20/08/2024
Inter-regional transfer limit variation - Kerang to Wemen 220kV line - VIC region - 20/08/2024
A planned outage of Kerang to Wemen 220kV line in the VIC region was scheduled from 0600 hrs 20/08/2024 to 1930 hrs 20/08/2024.
The outage has been completed and Kerang to Wemen 220kV line returned to service at 0925 hrs 20/08/2024
Constraint set revoked: V-KGWT
Manager NEM Real Time Operations
Inter-Regional Transfer limit variation - Murraylink
Inter-Regional Transfer limit variation - Murraylink
There has been an unplanned outage of the Murraylink interconnector.
The following constraint set was invoked at 2155 hrs 19/08/2024
I-MURRAYLINK
The constraint set contains the following interconnector on the left hand side.
V-S-MNSP1,VIC1-NSW1
Refer to AEMO Network Outage Scheduler (NOS) for further details.
Manager NEM Real Time Operations
Inter-Regional Transfer limit variation - Directlink - NSW Region
Inter-Regional Transfer limit variation - Directlink - NSW Region
There has been an unplanned outage of the No 1 Leg of Directlink .
The following constraint set was invoked at 1620 hrs 14/08/2024
N-MBTE_1
The constraint set contains the following interconnector on the left hand side.
N-Q-MNSP1
Refer AEMO Network Outage Scheduler (NOS) for further details.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - CollectorWF-Marulan 4 330kV LINE - NSW region - 14/08/2024
Inter-regional transfer limit variation - CollectorWF-Marulan 4 330kV LINE - NSW region - 14/08/2024
At 1006 hrs 14/08/2024 there was a short notice outage of CollectorWF-Marulan 4 330kV LINE.
The following constraint set(s) invoked at 1000 hrs 14/08/2024
N-CTMN_4_WG_CLOSE
This constraint set(s) contains equations with the following interconnectors on the LHS.
VIC1-NSW1,N-Q-MNSP1,NSW1-QLD1,V-S-MNSP1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Collector - Marulan No 4 330kV Line - NSW region - 14/08/2024
Inter-regional transfer limit variation - Collector - Marulan No 4 330kV Line - NSW region - 14/08/2024
A planned outage of Collector - Marulan No 4 330kV Line in the NSW region was scheduled from 0800 hrs 14/08/2024 to 1700 hrs 02/09/2024.
The outage has been cancelled.
Constraint set(s) invoked: N-CTMN_4_WG_CLOSE
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Keilor to Sth Morang 500kV Line - VIC region - 04/08/2024
Inter-regional transfer limit variation - Keilor to Sth Morang 500kV Line - VIC region - 04/08/2024
A planned outage of Keilor to Sth Morang 500kV Line in the VIC region was scheduled from 1000 hrs 04/08/2024 to 1300 hrs 04/08/2024.
The outage has been completed and Keilor to Sth Morang 500kV Line returned to service at 1050 hrs 04/08/2024
Constraint set(s) revoked: V-KTSM_R
Manager NEM Real Time Operations