STPASA - Suspect Lack Of Reserve Level 3 (LOR3) in the QLD Region on 01/02/2024
AEMO considers that there are suspect Forecast LOR3 conditions for the QLD region for the following periods:
1. From 0900 hrs to 1000 hrs 01/02/2024.
The maximum load (other than interruptible loads) forecast to be interrupted is 38 MW at 0930 hrs.
2. From 1130 hrs to 1200 hrs 01/02/2024.
The maximum load (other than interruptible loads) forecast to be interrupted is 62 MW at 1130 hrs.
AEMO is currently investigating these LOR3 forecast conditions to confirm whether they are valid.
AEMO Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 30/01/2024
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice 113904 is cancelled at 2340 hrs 28/01/2024.
No LOR2 condition is currently forecast in the STPASA period.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 29/01/2024
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 113906 is cancelled at 1415 hrs 28/01/2024.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 29/01/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:
[1.] From 1830 hrs 29/01/2024 to 1930 hrs 29/01/2024.
The forecast capacity reserve requirement is 626 MW.
The minimum capacity reserve available is 459 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 30/01/2024
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice 113898 has been updated at 0930 hrs 28/01/2024 to the following:
From 0830 hrs 30/01/2024 to 1130 hrs 30/01/2024.
The forecast capacity reserve requirement is 753 MW.
The minimum capacity reserve available is 528 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 29/01/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 113895 is cancelled at 0600 hrs 28/01/2024.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 30/01/2024
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice 113896 has been updated at 0530 hrs 28/01/2024 to the following:
[1.] From 0830 hrs 30/01/2024 to 1030 hrs 30/01/2024.
The forecast capacity reserve requirement is 685 MW.
The minimum capacity reserve available is 584 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 30/01/2024
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice 113872 has been updated at 0030 hrs 28/01/2024 to the following:
[1.] From 1430 hrs 30/01/2024 to 1530 hrs 30/01/2024.
The forecast capacity reserve requirement is 777 MW.
The minimum capacity reserve available is 771 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 29/01/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice 113889 has been updated at 0030 hrs 28/01/2024 to the following:
[[1.] From 1730 hrs 29/01/2024 to 1830 hrs 29/01/2024.
The forecast capacity reserve requirement is 1190 MW.
The minimum capacity reserve available is 1113 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations