[EventId:202402071330_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 07 February 2024 13:30
Issued by Australian Energy Market Operator Ltd at 1330 hrs on 7 February 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 7 February 2024.
Refer to market notice: 114412
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1330 hrs on 7 February 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202402070835_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 07 February 2024 08:35
Issued by Australian Energy Market Operator Ltd at 0835 hrs on 7 February 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 7 February 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 0835 hrs on 7 February 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 06/02/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:
[1.] From 1800 hrs 06/02/2024 to 1930 hrs 06/02/2024.
The forecast capacity reserve requirement is 1179 MW.
The minimum capacity reserve available is 988 MW.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 06/02/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 114379 is cancelled at 1715 hrs 06/02/2024.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 06/02/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 114359 has been updated at 1615 hrs to the following:
[1.] From 1830 hrs 06/02/2024 to 1900 hrs 06/02/2024.
The forecast capacity reserve requirement is 1128 MW.
The minimum capacity reserve available is 1095 MW.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 13/02/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
From 1730 hrs to 1800 hrs 13/02/2024.
The forecast capacity reserve requirement is 1515 MW.
The minimum capacity reserve available is 1478 MW.
AEMO Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 06/02/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 114357 has been updated at 1110 hrs to the following:
[1.] From 1730 hrs 06/02/2024 to 2030 hrs 06/02/2024.
The forecast capacity reserve requirement is 1014 MW.
The minimum capacity reserve available is 884 MW.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 06/02/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 114355 has been updated at 1000 hrs to the following:
[1.] From 1800 hrs 06/02/2024 to 1930 hrs 06/02/2024.
The forecast capacity reserve requirement is 1040 MW.
The minimum capacity reserve available is 1015 MW.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 06/02/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:
[1.] From 1830 hrs 06/02/2024 to 1900 hrs 06/02/2024.
The forecast capacity reserve requirement is 1178 MW.
The minimum capacity reserve available is 1073 MW.