112396GENERAL NOTICE16/12/2023 09:14:41 AM

QNI Minor testing (NSW to Qld) 16th December 2023

AEMO ELECTRICITY MARKET NOTICE

Refer to market notice 110640

There is an opportunity for testing QNI Minor for flows from NSW to Qld up to 750 MW on Tuesday 16th December from 0930 to 1800hrs.

This test includes a trip and reclose of a line in northern NSW.

Please also refer to the published formal QNI minor testing information at the following link:
https://www.aemo.com.au/consultations/current-and-closed-consultations/qld-to-nsw-interconnector-qni-upgrade

Ben Blake
AEMO Operations
112392RESERVE NOTICE15/12/2023 04:35:43 PM

STPASA - Update to the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 19/12/2023

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 112390 has been updated at 1600 hrs 15/12/2023 to the following:

From 1430 hrs to 1600 hrs 19/12/2023.
The forecast capacity reserve requirement is 730 MW.
The minimum capacity reserve available is 171 MW.

AEMO is seeking a market response.

AEMO estimates that the latest time at which permission can be given for a planned outage to proceed is 0530 hrs on 19/12/2023.

AEMO Operations
112390RESERVE NOTICE15/12/2023 03:53:54 PM

STPASA - Update to the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 19/12/2023

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 112371 has been updated at 1500 hrs 15/12/2023 to the following:

From 1430 hrs to 1600 hrs 19/12/2023.
The forecast capacity reserve requirement is 730 MW.
The minimum capacity reserve available is 273 MW.

AEMO is seeking a market response.

AEMO estimates that the latest time at which permission can be given for a planned outage to proceed is 0530 hrs on 19/12/2013.

AEMO Operations
112373GENERAL NOTICE15/12/2023 10:10:57 AM

Network Augmentation Commissioned - SA Region - 15/12/2023

AEMO ELECTRICITY MARKET NOTICE

Network Augmentation Commissioned - SA Region - 15/12/2023

Commissioned:
Bundey 330kV substation, 330kV East Bus and 330kV West Bus.

Manager NEM Real Time Operations
112371RESERVE NOTICE15/12/2023 09:42:01 AM

STPASA - Update to the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 19/12/2023

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 112317 has been updated at 0900 hrs 15/12/2023 to the following:

From 1430 hrs to 1600 hrs 19/12/2023.
The forecast capacity reserve requirement is 730 MW.
The minimum capacity reserve available is 232 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
112361GENERAL NOTICE14/12/2023 07:47:56 PM

Network Augmentation Commissioned - QLD Region - 14/12/2023

AEMO ELECTRICITY MARKET NOTICE

Network Augmentation Commissioned - QLD Region - 14/12/2023

Commissioned:
R15 MacIntyre 330 kV Switching Station
R14 Tummaville - R15 MacIntyre No.9918 330 kV Line
R14 Tummaville - R15 MacIntyre No.9919 330 kV Line

Manager NEM Real Time Operations
112358RESERVE NOTICE14/12/2023 04:54:37 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 14/12/2023

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 112328 is cancelled at 1645 hrs 14/12/2023.

Manager NEM Real Time Operations
112328RESERVE NOTICE14/12/2023 02:53:37 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 14/12/2023

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 112300 has been updated at 1450 hrs to the following:

[1.] From 1730 hrs 14/12/2023 to 1800 hrs 14/12/2023.
The forecast capacity reserve requirement is 700 MW.
The minimum capacity reserve available is 579 MW.


AEMO is seeking a market response.

AEMO estimates the latest time at which it would need to intervene through an AEMO intervention event is 1630 hrs on 14/12/2023.

Manager NEM Real Time Operations
112320GENERAL NOTICE14/12/2023 02:04:02 PM

Update - Vulnerbale lines - SA region

AEMO ELECTRICITY MARKET NOTICE.

Vulnerable lines in SA region.

[Special Reclassification of Transmission Lines during lightning]


Refer to AEMO Electricity Market Notices 111818


At 1350 28/11/2023 hrs Tungkillo- Robertstown No.1 and No.2 275kV lines and the Robertstown No.1 and No.2 synchronous condensers were reclassified due to the elements tripping at 0534 hrs 28/11/2023

The cause of trip was identified as due to lightning.

In accordance with SO_OP_3715, AEMO now considers the following elements to be vulnerable due to lightning.


Elements: Tungkillo- Robertstown No.1 and No.2 275kV lines and the Robertstown No.1 and No.2 synchronous condensers.


Manager NEM Real Time Operations