Cancellation of a Non-Credible Contingency Event: Edmonton - Woree 7284 132 kV Line, Barron Gorge - Kamerunga 7143 132 kV Line and the Barron Gorge - Kamerunga 7184 132 kV Line in QLD Region
Cancellation of the reclassification of a Non-Credible contingency event as a Credible contingency event in the Qld region.
Based on the advice from the asset owner, AEMO considers the trip of the Edmonton - Woree 7284 132 kV Line , Barron Gorge - Kamerunga 7143 132 kV Line and the Barron Gorge - Kamerunga 7184 132 kV Line is no longer reasonably possible. Accordingly, its classification has reverted to a non-credible contingency event.
Region: QLD
Elements: Edmonton - Woree 7284 132 kV Line, Barron Gorge - Kamerunga 7143 132 kV Line and the Barron Gorge - Kamerunga 7184 132 kV Line
Cancellation time: 1200 hrs 15/12/2023
Constraint set(s) revoked: Nil
Refer AEMO Electricity Market Notice 102439
Manager NEM Real Time Operations
Cancellation of the Reclassification of a Non Credible Contingency event to a Credible Event - Kareeya Power Station - Qld Region
Cancellation of the reclassification of a Non-Credible contingency event as a Credible contingency event in the Qld region.
Based on the advice from the asset owner, AEMO considers the trip of the Kareeya Power Station Units 1,2,3 and 4 is no longer reasonably possible. Accordingly, its classification has reverted to a non-credible contingency event.
Region: QLD
Elements: Kareeya Power Station Units 1,2,3 and 4
Cancellation time: 1130 hrs 15/12/2023
Constraint set(s) revoked: Nil
Refer AEMO Electricity Market Notice 111965
Manager NEM Real Time Operations
Network Augmentation Commissioned - SA Region - 15/12/2023
Network Augmentation Commissioned - SA Region - 15/12/2023
Commissioned:
Bundey 330kV substation, 330kV East Bus and 330kV West Bus.
Manager NEM Real Time Operations
[EventId:202312151000_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 15 December 2023 10:00
Issued by Australian Energy Market Operator Ltd at 1000 hrs on 15 December 2023
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 15 December 2023.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1000 hrs on 15 December 2023.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
STPASA - Update to the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 19/12/2023
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 112317 has been updated at 0900 hrs 15/12/2023 to the following:
From 1430 hrs to 1600 hrs 19/12/2023.
The forecast capacity reserve requirement is 730 MW.
The minimum capacity reserve available is 232 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
ENTERED INTO RERT CONTRACTS
AEMO Intervention Event, Reliability and Emergency Reserve Trader (RERT) - NSW1 Region - 14/12/2023
Refer to AEMO Electricity Market Notice no. 112333.
AEMO has entered into a reserve contract to maintain the power system in a Reliable operating state during the following period of time;
15:30 to 19:30 hrs 14/12/2023
The latest time to activate or dispatch these reserves has now passed. No reserve contracts were activated or pre-activated.
Manager NEM Real Time Operations
Cancellation of a Non-Credible Contingency Event: Armidale - Dumaresq 8C 330kV line and Armidale - Sapphire WF 8E 330kV line in NSW1 due to Lightning.
Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: NSW1
Lines: Armidale - Dumaresq 8C 330kV and Armidale - Sapphire WF 8E 330kV
Cancellation time: 15/12/2023 04:19
Constraint set(s) revoked:
N-ARDM_ARSR_1PH_N-2 Constraint set contains the following interconnector(s) on the left hand side:
N-Q-MNSP1
NSW1-QLD1
Refer AEMO Electricity Market Notice 112368
Auto-generated on behalf of Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Armidale - Dumaresq 8C 330kV line and Armidale - Sapphire WF 8E 330kV line in NSW1 due to Lightning.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: NSW1
Lines: Armidale - Dumaresq 8C 330kV and Armidale - Sapphire WF 8E 330kV
Duration: 15/12/2023 03:18 until further notice
Constraint set(s) invoked:
N-ARDM_ARSR_1PH_N-2 Constraint set contains the following interconnector(s) on the left hand side:
N-Q-MNSP1
NSW1-QLD1
Auto-generated on behalf of Manager NEM Real Time Operations
Cancellation of a Non-Credible Contingency Event: Armidale - Dumaresq 8C 330kV line and Armidale - Sapphire WF 8E 330kV line in NSW1 due to Lightning.
Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: NSW1
Lines: Armidale - Dumaresq 8C 330kV and Armidale - Sapphire WF 8E 330kV
Cancellation time: 14/12/2023 22:39
Constraint set(s) revoked:
N-ARDM_ARSR_1PH_N-2 Constraint set contains the following interconnector(s) on the left hand side:
N-Q-MNSP1
NSW1-QLD1
Refer AEMO Electricity Market Notice 112360
Auto-generated on behalf of Manager NEM Real Time Operations