[EventId:202411281325_confirmed] Prices for interval 28-Nov-2024 13:25 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1345 hrs on 28 November 2024
PRICES ARE NOW CONFIRMED for trading interval 28-Nov-2024 13:25.
In accordance with Market Notice 121152 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202411281345_confirmed] Prices for interval 28-Nov-2024 13:45 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1345 hrs on 28 November 2024
PRICES ARE NOW CONFIRMED for trading interval 28-Nov-2024 13:45.
In accordance with Market Notice 121157 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202411281340_confirmed] Prices for interval 28-Nov-2024 13:40 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1345 hrs on 28 November 2024
PRICES ARE NOW CONFIRMED for trading interval 28-Nov-2024 13:40.
In accordance with Market Notice 121156 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202411281335_confirmed] Prices for interval 28-Nov-2024 13:35 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1345 hrs on 28 November 2024
PRICES ARE NOW CONFIRMED for trading interval 28-Nov-2024 13:35.
In accordance with Market Notice 121154 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202411281330_confirmed] Prices for interval 28-Nov-2024 13:30 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1345 hrs on 28 November 2024
PRICES ARE NOW CONFIRMED for trading interval 28-Nov-2024 13:30.
In accordance with Market Notice 121153 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202411281320_confirmed] Prices for interval 28-Nov-2024 13:20 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1345 hrs on 28 November 2024
PRICES ARE NOW CONFIRMED for trading interval 28-Nov-2024 13:20.
In accordance with Market Notice 121149 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 29/11/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Periods:
[1.] From 0600 hrs 29/11/2024 to 0800 hrs 29/11/2024.
The forecast capacity reserve requirement is 1430 MW.
The minimum capacity reserve available is 992 MW.
[2.] From 1000 hrs 29/11/2024 to 1330 hrs 29/11/2024.
The forecast capacity reserve requirement is 1430 MW.
The minimum capacity reserve available is 1110 MW.
[3.] From 1500 hrs 29/11/2024 to 1530 hrs 29/11/2024.
The forecast capacity reserve requirement is 1705 MW.
The minimum capacity reserve available is 1371 MW.
[4.] From 1700 hrs 29/11/2024 to 1730 hrs 29/11/2024.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 1258 MW.
Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Bayswater - Mt Piper No.5A3 500kV line and Wollar - Mt Piper No.5A5 500kV line in NSW1 due to Lightning.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: NSW1
Lines: Bayswater - Mt Piper No.5A3 500kV and Wollar - Mt Piper No.5A5 500kV
Duration: 28/11/2024 11:42 until further notice
Constraint set(s) invoked:
NONE
Auto-generated on behalf of Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Bannaby - Mt Piper 5A6 500kV line and Bannaby - Mt Piper 5A7 500kV line in NSW1 due to Lightning.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: NSW1
Lines: Bannaby - Mt Piper 5A6 500kV and Bannaby - Mt Piper 5A7 500kV
Duration: 28/11/2024 11:22 until further notice
Constraint set(s) invoked:
N-5A6+5A7_N-2 Constraint set contains the following interconnector(s) on the left hand side:
N-Q-MNSP1
NSW1-QLD1
VIC1-NSW1
Auto-generated on behalf of Manager NEM Real Time Operations