Non-credible contingency event - QLD region - 12/12/2024
Non-credible contingency event - QLD region - 12/12/2024
At 2026 hrs the Kamerunga to Barron George 132 kV Line 7184 and the Kamerunga to Barron George 132 kV Line 7141 tripped.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 13/12/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 121800 is cancelled at 1945hrs 12/12/2024
No LOR condition is currently forecast in the PDPASA period
AEMO Operations
Cancellation of Actual (LOR1) condition in the NSW region - 12/12/2024
Cancellation of Actual (LOR1) condition in the NSW region - 12/12/2024
The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No.121803 is cancelled at 1945 hrs 12/12/2024.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region on 12/12/2024
Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 12/12/2024
An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1830 hrs.
The Actual LOR1 condition is forecast to exist until 1930 hrs.
The forecast capacity reserve requirement is 1430 MW.
The minimum capacity reserve available is 1338 MW.
Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Ross - Tully South - Woree No.8905 275 kV line line and Cardwell - Tully No.7389 132kV line line in QLD1 due to Lightning.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: QLD1
Lines: Ross - Tully South - Woree No.8905 275 kV line and Cardwell - Tully No.7389 132kV line
Duration: 12/12/2024 17:40 until further notice
Constraint set(s) invoked:
NONE
Auto-generated on behalf of Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 13/12/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 121782 has been updated at 1630 hrs to the following:
[1.] From 1600 hrs 13/12/2024 to 1800 hrs 13/12/2024.
The forecast capacity reserve requirement is 1430 MW.
The minimum capacity reserve available is 926 MW.
[2.] From 1900 hrs 13/12/2024 to 1930 hrs 13/12/2024.
The forecast capacity reserve requirement is 1500 MW.
The minimum capacity reserve available is 1327 MW.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the TAS Region on 16/12/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the TAS region for the following period:
From 1730 hrs to 1830 hrs 16/12/2024.
The forecast capacity reserve requirement is 238 MW.
The minimum capacity reserve available is 185 MW.
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the VIC Region on 16/12/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the VIC region for the following period:
From 1530 hrs to 1630 hrs 16/12/2024.
The forecast capacity reserve requirement is 1156 MW.
The minimum capacity reserve available is 694 MW.
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 17/12/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:
From 1800 hrs to 1900 hrs 17/12/2024.
The forecast capacity reserve requirement is 990 MW.
The minimum capacity reserve available is 836 MW.