Cancellation of a Non-Credible Contingency Event: Yallourn - Rowville 7 220 kV line and Yallourn - Rowville 8 220 kV line in VIC1 due to Lightning.
Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: VIC1
Lines: Yallourn - Rowville 7 220 kV and Yallourn - Rowville 8 220 kV
Cancellation time: 27/11/2024 21:14
Constraint set(s) revoked:
V-ROYP78_R_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NONE
Refer AEMO Electricity Market Notice 121073
Auto-generated on behalf of Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the NSW region - 27/11/2024
Cancellation of Actual (LOR1) condition in the NSW region - 27/11/2024
The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No.121106 is cancelled at 2000 hrs 27/11/2024.
Manager NEM Real Time Operations
End of RERT Dispatch - 27/11/2024 and End of intervention event
End of Reliability and Emergency Reserve Trader (RERT) dispatch for - NSW1 Region - 27/11/2024 and end of AEMO Intervention Event.
Refer AEMO Electricity Market Notices 121102
Activation of reserve contract(s) has ended.
The reserve contract(s) were activated from 15:45 hrs 27/11/2024 to 16:45 hrs 27/11/2024
The AEMO Intervention Event ended from 16:45 hrs 27/11/2024
Manager NEM Real Time Operations
Cancellation - AEMO Intervention Event - NSW region 27/11/2024
Cancellation - AEMO Intervention Event - NSW region 27/11/2024
Refer to Market Notice 121070
The AEMO Intervention Event and all associated directions are cancelled from 1645 hrs on 27/11/2024.
Manager NEM Real Time Operations
Cancellation: Direction issued to: Munmorah Battery ProjectCo Pty Ltd - WARATAHBESS1
Cancellation: Direction issued to: Munmorah Battery ProjectCo Pty Ltd - WARATAHBESS1
Refer to Market Notice 121083
Direction is cancelled from: 1645 hrs 27/11/2024
Manager NEM Real Time Operations
Cancellation: Direction issued to: Iberdrola Australia Wallgrove Pty Limited - WALLGROVE BESS
Cancellation: Direction issued to: Iberdrola Australia Wallgrove Pty Limited - WALLGROVE BESS
Refer to Market Notice 121067
Direction is cancelled from: 1645 hrs 27/11/2024
Manager NEM Real Time Operations
Update - Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 27/11/2024
Update - Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 27/11/2024
The Actual LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 121089 has been updated at 1645 hrs to the following:
The Actual LOR1 condition is forecast to exist until 1900 hrs.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 859 MW.
Manager NEM Real Time Operations
AEMO Intervention Event - Intervention price dispatch intervals - dd/mm/yyyy
AEMO Intervention Event - Intervention price dispatch intervals - dd/mm/yyyy
Refer AEMO Electricity Market Notice no. 121100
An AEMO Intervention Event, the dispatch of Reliability and Emergency Reserve Trader (RERT) has been implemented.
The AEMO Intervention Event commenced at 15:45 hrs 27/11/2024 and is forecast to apply until 18:00 hrs 27/11/2024
AEMO declares all dispatch intervals during the AEMO Intervention Event to be intervention price dispatch intervals.
The AEMO Intervention Event is expected to affect dispatch quantities for intervention pricing purposes from the 15:50 hrs dispatch interval on 27/11/2024
Manager NEM Real Time Operations
RERT DISPATCHED
AEMO Intervention Event, Reliability and Emergency Reserve Trader (RERT) - NSW1 Region- 27/11/2024
Refer AEMO Electricity Market Notice no. 121054
AEMO has dispatched/activated reserve contract(s) to maintain the power system in a Reliable operating state.
The reserve contract(s) was dispatched/activated at 15:45 hrs 27/11/2024 and is forecast to apply until 18:00 hrs 27/11/2024
AEMO has implemented an AEMO intervention event for the duration the reserve contract(s) is dispatched/activated/
To facilitate the RERT process, constraints commencing with the following identifiers may be evident at various times in dispatch,
#RT_NSW1
Manager NEM Real Time Operations