Filter by category
Filter by Date
NEM Local Temperature Alerts for SA from 03 Dec 2024 to 07 Dec 2024
AEMO's weather service provider has issued forecast temperatures equal to or greater than the NEM Local Temperature Alert Levels for listed weather stations below.
SA
Port Augusta Ap (39+ Deg C): 5th Dec, 6th Dec
The NEM Local Temperature Alert Levels are:
Launceston Ti Tree Bend: 33 Deg C, Dalby Airport: 37 Deg C, for all other selected weather stations: 39 Deg C.
AEMO requests Market Participants to:
1. review the weather forecast in the local area where their generating units / MNSP converter stations are located and,
2. if required, update the available capacity in their dispatch offers or availability submissions consistent with the forecast temperatures.
Further information is available at:
https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-reliability/projected-assessment-of-system-adequacy/nem-local-temperature-alerts
AEMO Operations Planning
Reclassification of a Non-Credible Contingency Event: Bayswater - Mt Piper No.5A3 500kV line and Wollar - Mt Piper No.5A5 500kV line in NSW1 due to Lightning.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: NSW1
Lines: Bayswater - Mt Piper No.5A3 500kV and Wollar - Mt Piper No.5A5 500kV
Duration: 03/12/2024 10:08 until further notice
Constraint set(s) invoked:
NONE
Auto-generated on behalf of Manager NEM Real Time Operations
[EventId:202412030645_confirmed] Prices for interval 03-Dec-2024 06:45 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0705 hrs on 3 December 2024
PRICES ARE NOW CONFIRMED for trading interval 03-Dec-2024 06:45.
In accordance with Market Notice 121394 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202412030705_confirmed] Prices for interval 03-Dec-2024 07:05 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0705 hrs on 3 December 2024
PRICES ARE NOW CONFIRMED for trading interval 03-Dec-2024 07:05.
In accordance with Market Notice 121398 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202412030700_confirmed] Prices for interval 03-Dec-2024 07:00 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0705 hrs on 3 December 2024
PRICES ARE NOW CONFIRMED for trading interval 03-Dec-2024 07:00.
In accordance with Market Notice 121397 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202412030655_confirmed] Prices for interval 03-Dec-2024 06:55 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0705 hrs on 3 December 2024
PRICES ARE NOW CONFIRMED for trading interval 03-Dec-2024 06:55.
In accordance with Market Notice 121396 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202412030650_confirmed] Prices for interval 03-Dec-2024 06:50 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0705 hrs on 3 December 2024
PRICES ARE NOW CONFIRMED for trading interval 03-Dec-2024 06:50.
In accordance with Market Notice 121395 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202412030640_confirmed] Prices for interval 03-Dec-2024 06:40 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0705 hrs on 3 December 2024
PRICES ARE NOW CONFIRMED for trading interval 03-Dec-2024 06:40.
In accordance with Market Notice 121393 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
Cancellation of the reclassification of a Non-Credible Contingency Event: Brinkworth-Davenport, Brinkworth-Templers West and Para-Templers West 275kV lines in SA due to severe weather warning .
Cancellation of the reclassification of a non-credible contingency event as a credible contingency event due to severe weather warning.
AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any severe weather warning in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: SA
Lines: Brinkworth-Davenport, Brinkworth-Templers West and Para-Templers West 275kV lines
Cancellation time: 02/12/2024 22:45
Constraint set(s) revoked: Nil
Refer AEMO Electricity Market Notice 121388
Manager NEM Real Time Operations