Cancellation of a Non-Credible Contingency Event: Eildon PS - Mt Beauty No.1 220 kV line and Eildon PS - Mt Beauty No.2 220 kV line in VIC1 due to Lightning.
Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: VIC1
Lines: Eildon PS - Mt Beauty No.1 220 kV and Eildon PS - Mt Beauty No.2 220 kV
Cancellation time: 26/11/2024 21:29
Constraint set(s) revoked:
NONE
Refer AEMO Electricity Market Notice 120983
Auto-generated on behalf of Manager NEM Real Time Operations
Update - Non-credible contingency event - NSW region - 26/11/2024
Update - Non-credible contingency event - NSW region - 26/11/2024
Refer AEMO Electricity Market Notice 121008
The cause of this non credible contingency event is not known at this stage.
AEMO is not satisfied that this non credible event is unlikely to re-occur.
AEMO has therefore reclassified this event as a credible contingency event until further notice.
Region: NSW
Elements: Uranquinty Units 11,12 and 13.
Duration: 1900 hrs 26/11/2024 until further notice
Constraint set(s) invoked: Nil
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 26/11/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 120981 has been updated at 1550 hrs to the following:
[1.] From 1630 hrs 26/11/2024 to 1930 hrs 26/11/2024.
The forecast capacity reserve requirement is 1380 MW.
The minimum capacity reserve available is 989 MW.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 29/11/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 120923 has been updated at 1400 hrs 26/11/2024 to the following:
1. From 0000 hrs 29/11/2024 to 0030 hrs 29/11/2024.
The forecast capacity reserve requirement is 1705 MW.
The minimum capacity reserve available is 1456 MW.
2. From 1230 hrs 29/11/2024 to 1300 hrs 29/11/2024.
The forecast capacity reserve requirement is 1538 MW.
The minimum capacity reserve available is 1502 MW.
3. From 1530 hrs 29/11/2024 to 1800 hrs 29/11/2024.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 846 MW.
AEMO Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 28/11/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 120922 has been updated at 1400 hrs 26/11/2024 to the following:
1. From 0500 hrs 28/11/2024 to 0600 hrs 28/11/2024.
The forecast capacity reserve requirement is 1829 MW.
The minimum capacity reserve available is 1731 MW.
2. From 2300 hrs 28/11/2024 to 2359 hrs 28/11/2024.
The forecast capacity reserve requirement is 1712 MW.
The minimum capacity reserve available is 1231 MW.
AEMO Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 28/11/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 120925 has been updated at 1400 hrs 26/11/2024 to the following:
1. From 1500 hrs 28/11/2024 to 1530 hrs 28/11/2024.
The forecast capacity reserve requirement is 881 MW.
The minimum capacity reserve available is 867 MW.
2. From 1630 hrs 28/11/2024 to 2030 hrs 28/11/2024.
The forecast capacity reserve requirement is 1234 MW.
The minimum capacity reserve available is 968 MW.
AEMO Operations
Reclassification of a Non-Credible Contingency Event: Eildon PS - Mt Beauty No.1 220 kV line and Eildon PS - Mt Beauty No.2 220 kV line in VIC1 due to Lightning.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: VIC1
Lines: Eildon PS - Mt Beauty No.1 220 kV and Eildon PS - Mt Beauty No.2 220 kV
Duration: 26/11/2024 14:27 until further notice
Constraint set(s) invoked:
NONE
Auto-generated on behalf of Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 26/11/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 120954 has been updated at 1355 hrs to the following:
[1.] From 1630 hrs 26/11/2024 to 1730 hrs 26/11/2024.
The forecast capacity reserve requirement is 1380 MW.
The minimum capacity reserve available is 789 MW.
[2.] From 1800 hrs 26/11/2024 to 2000 hrs 26/11/2024.
The forecast capacity reserve requirement is 1690 MW.
The minimum capacity reserve available is 1001 MW.
Manager NEM Real Time Operations
NON-CONFORMANCE Region NSW1 Tuesday, 26 November 2024
NON-CONFORMANCE NSW1 Region Tuesday, 26 November 2024
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: WTAHB1
Duration: 26/11/2024 13:35 to 26/11/2024 13:50
Amount: 11 MW
Constraint: NC-N_WTAHB1
Auto-generated on behalf of Manager NEM Real Time Operations