88875GENERAL NOTICE26/07/2021 01:12:50 PM

Daily planned outage of Heywood No.2 500kV Busbar and Heywood- Mortlake PS 500kV line in Victoria region on 2 and 3 August 2021

AEMO ELECTRICITY MARKET NOTICE

The Heywood No.2 500 kV busbar and Heywood-Mortlake PS 500kV line in Victoria Region is planned out of serviice on the following periods:

-0700hrs to 1700hrs on 02/08/2021
-0700hrs to 1700hrs on 03/08/2021


A credible contingency event during this planned outage could cause synchronous separation of the South Australia (SA) region from the rest of the NEM. If separation occurs, load may be interrupted due to the operation of the Automatic Under Frequency Load Shedding (AUFLS) scheme in SA.

The credible separation contingency is managed as follows:

When power transfer is from SA to Victoria (Vic), contingency lower FCAS will be sourced from SA.
When power transfer is from Vic to SA, due to the 47-52Hz island separation frequency band advised by the SA jurisdiction, contingency raise FCAS is not sourced in SA and the AUFLS scheme may respond to low frequency events.
Power transfer will be restricted on Victoria - South Australia interconnector (Heywood interconnector).

Forecast capacity reserves in the SA region are currently sufficient to meet electricity demand during the planned outage.

The following constraint sets have been invoked for this outage:

-V-HYMO
-F-I-HYSE
-S-X_BC_CP
-V-HYTX_M12
-V-HY_500BUS
-I-VS_050

Refer AEMO Network Outage Schedule (NOS) for further details.

AEMO Operations
88874PRICES SUBJECT TO REVIEW26/07/2021 01:05:14 PM

[EventId:202107261310_review] Prices for interval 26-Jul-2021 13:10 are subject to review

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1305 hrs on 26 July 2021

PRICES ARE SUBJECT TO REVIEW for dispatch interval 26-Jul-2021 13:10.

AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs


This is an AEMO autogenerated Market Notice.
88873PRICES SUBJECT TO REVIEW26/07/2021 01:00:23 PM

[EventId:202107261305_review] Prices for interval 26-Jul-2021 13:05 are subject to review

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1300 hrs on 26 July 2021

PRICES ARE SUBJECT TO REVIEW for dispatch interval 26-Jul-2021 13:05.

AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs


This is an AEMO autogenerated Market Notice.
88872PRICES SUBJECT TO REVIEW26/07/2021 12:56:53 PM

[EventId:202107261300_review] Prices for interval 26-Jul-2021 13:00 are subject to review

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1255 hrs on 26 July 2021

PRICES ARE SUBJECT TO REVIEW for dispatch interval 26-Jul-2021 13:00.

AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs


This is an AEMO autogenerated Market Notice.
88871RESERVE NOTICE26/07/2021 12:54:50 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the Qld region on 27/07/2021

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the Qld region for the following period:

From 0700 hrs to 0730 hrs 27/07/2021.
The forecast capacity reserve requirement is 870 MW.
The minimum capacity reserve available is 768 MW.

Manager NEM Real Time Operations
88870PRICES SUBJECT TO REVIEW26/07/2021 12:50:14 PM

[EventId:202107261255_review] Prices for interval 26-Jul-2021 12:55 are subject to review

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1250 hrs on 26 July 2021

PRICES ARE SUBJECT TO REVIEW for dispatch interval 26-Jul-2021 12:55.

AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs


This is an AEMO autogenerated Market Notice.
88869PRICES SUBJECT TO REVIEW26/07/2021 12:45:17 PM

[EventId:202107261250_review] Prices for interval 26-Jul-2021 12:50 are subject to review

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1245 hrs on 26 July 2021

PRICES ARE SUBJECT TO REVIEW for dispatch interval 26-Jul-2021 12:50.

AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs


This is an AEMO autogenerated Market Notice.
88868RESERVE NOTICE26/07/2021 09:11:28 AM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the Qld region on 26/07/2021

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the Qld region advised in AEMO Electricity Market Notice No. 88858 is cancelled at 0910 hrs 26/07/2021.

Manager NEM Real Time Operations
88867NON-CONFORMANCE26/07/2021 07:20:10 AM

NON-CONFORMANCE Region NSW1 Monday, 26 July 2021

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE NSW1 Region Monday, 26 July 2021

AEMO declared a schedule generating unit non-conforming

Unit: VP6
Duration: 26/07/2021 07:15 to 26/07/2021 07:20
Amount: -33 MW
Constraint: NC-N_VP6

Auto-generated on behalf of Manager NEM Real Time Operations