Victorian MRIM meter data
Aggregated half hour energy for all type 5 meter installation sites in Victoria
The following file contains the aggregated half hour energy for all type 5 meter installation sites (meter installation code = MRIM) for each of the profile areas relating to the 5 distribution networks in Victoria
The majority of these MRIM meters will be the Vic-AMI meters which were rolled out from mid 2011. Note that all these sites will have an annual consumption of less than 160 MWh.
It is planned that this data will be updated on a quarterly basis once the NSLP has been locked for the full quarter period.
-
31/05/2021
MRIM - Victoria - 01 October 2020 to 31 December 2020
109.78 KB -
31/05/2021
MRIM - Victoria - 01 July 2020 to 30 September 2020
111.77 KB -
01/02/2021
MRIM - Victoria - 01 April 2020 to 30 June 2020
110.21 KB -
14/10/2020
MRIM - Victoria - 01 January 2020 to 31 March 2020
108.76 KB -
14/10/2020
MRIM - Victoria - 01 October 2019 to 31 December 2019
110.08 KB -
24/03/2020
MRIM - Victoria - 01 July 2019 to 30 September 2019
111.59 KB -
08/11/2019
MRIM - Victoria - 01 April 2019 to 30 June 2019
109.9 KB -
20/09/2019
MRIM - Victoria - 01 January 2019 to 31 March 2019
108.32 KB -
20/09/2019
MRIM - Victoria - 01 October 2018 to 31 December 2018
109.84 KB -
20/09/2019
MRIM - Victoria - 01 July 2018 to 30 September 2018
111.51 KB
For further information on these documents, please contact AEMO.