In accordance with rule 5.20A of the National Electricity Rules (NER), AEMO is required to undertake a General Power System Risk Review (GPSRR) and prepare a GPSRR report for the National Electricity Market (NEM) at least annually. From 2023, the GPSRR replaces and expands on the scope of the previous Power System Frequency Risk Review (PSFRR).

View previous PSFRRs

The GPSRR is an integrated, annual review of major power system risks in the National Electricity Market (NEM). The purpose of the GPSRR is to review:

  • A prioritised set of risks comprising contingency events and other events and conditions that could lead to cascading outages or major supply disruptions.
  • The current arrangements for managing the identified priority risks and options for their future management.
  • The arrangements for management of existing protected events and consideration of any changes or revocation.
  • The performance of existing emergency frequency control schemes and the need for any modifications.

Current status

AEMO has now completed the 2024 GSPRR draft report consultation. The final 2024 GPSRR report was published on by 25 July 2024.

Draft 2024 GPSRR report consultation

AEMO held an industry question and answer session on the draft 2024 GPSRR report on 7 June 2024 for all Registered Participants and interested parties. A summary of the feedback received is summarised in Appendix 6 of the final report.

2024 GPSRR

2024 GPSRR approach

Previous GPSRRs