Cancellation - Foreseeable intervention to manage power system security in SA region 24/09/2024
Cancellation - Foreseeable intervention to manage power system security in SA region 24/09/2024
Refer Market Notice 118400
AEMO no longer foresees a possible requirement for intervention to manage power system security in SA region. The advice of possible intervention is cancelled from 1600 hrs 23/09/2024.
Manager NEM Real Time Operations
Cancellation - AEMO Intervention Event - SA region 22/09/2024
Cancellation - AEMO Intervention Event - SA region 22/09/2024
Refer to Market Notice 118371
The AEMO Intervention Event and all associated directions are cancelled from 1530 hrs on 23/09/2024.
Manager NEM Real Time Operations
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Refer to Market Notice 118370
Direction is cancelled from: 1530 hrs 23/09/2024
Manager NEM Real Time Operations
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN
Refer to Market Notice 118397
Direction is cancelled from: 1530 hrs 23/09/2024
Manager NEM Real Time Operations
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0000 hrs 24/09/2024.
The foreseeable circumstance requiring the need for intervention is Voltage.
Manager NEM Real Time Operations
Cancellation - Reclassification of a Non-Credible Contingency Event: Eraring Power Station in NSW Region 23/09/2024
Cancellation - Reclassification of a Non-Credible Contingency Event: Eraring Power Station in NSW Region 23/09/2024
Refer to MN 118393
Based on advice from the asset owner, AEMO no longer considers the simultaneous trip of Eraring Power Station Units 2 and 4 as a credible contingency event.
Therefore AEMO cancels the reclassification as a credible contingency event from 1250 hrs 23/09/2024.
Constraint set N-ERARING_N-2 revoked from 1250 hrs 23/09/2024
Manager NEM Real Time Operations
Update Direction - AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN
Update Direction - AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN
Refer AEMO Electricity Participant Notice 118372
The TORRB4 TORRENS ISLAN direction is now expected to stay in place until 1530 hrs 23/09/2024.
The direction update is issued at 1240 hrs 23/09/2024.
Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Eraring Power Station in NSW Region 23/09/2024
Reclassification of a Non-Credible Contingency Event: Eraring Power Station in NSW Region 23/09/2024
Based on advice from the asset owner, AEMO has declared the simultaneous trip of Eraring Power Station Units 2 and 4 as a credible contingency event.
AEMO considers the simultaneous trip of those generators to now be more likely.
AEMO has reclassified this as a credible contingency event from 1000 hrs 23/09/2024.
To manage power system security constraint set N-ERARING_N-2 invoked from 1000 hrs 23/09/2024 until further notice.
Manager NEM Real Time Operations
Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT
Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT
Refer to Market Notice 118386
Direction is cancelled from: 0400 hrs 23/09/2024