Market Notices

115145RESERVE NOTICE26/02/2024 03:23:09 PM

STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 29/02/2024

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 115114 has been updated at 1400 hrs 26/02/2024 to the following:

From 1700 hrs to 2030 hrs 29/02/2024.
The forecast capacity reserve requirement is 1259 MW.
The minimum capacity reserve available is 729 MW.

AEMO Operations
115144MARKET SYSTEMS26/02/2024 02:21:37 PM

CHG0085807 | Completed | Pre-Production | MSATS - eMDM Pre-Production Maintenance AKS v1.27 upgrade

Change Number: CHG0085807
Notification issued to: Market Notice
Notification Type: Completed
Change Type: Normal
Service/Component: MDM - Meter Data Management
Change Title: MSATS - eMDM Pre-Production Maintenance AKS v1.27 upgrade
Support Information: Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
115136MARKET SYSTEMS26/02/2024 01:54:50 PM

CHG0082690 | UPDATED | Production | MSATS NEM Reform Metering Exemptions and B2M r44 Schema Go-Live

Change Number: CHG0082690
Notification issued to: Market Notice
Notification Type: Initial
Change Type: Normal
Service/ Component: MSATS - Consumer Administration and Transfer Solution(CATS)
Change Title: MSATS NEM Reform Metering Exemptions and B2M r44 Schema Go-Live
Change Start Date & Time: 03/03/2024 09:00:00 AEST
Change End Date & Time: 03/03/2024 17:00:00 AEST
Outage Start Date & Time: 03/03/2024 10:00:00 AEST
Outage End Date & Time: 03/03/2024 14:00:00 AEST
Environment: Production
Participant Impact and Requirements: Users will not be able to access MSATS during the outage period.

Meter data processing and RM reports will not be available during the outage period.

User Rights Management (URM) will continue to operate, however the administration screens will not be accessible.

MSATS B2B Transactions and B2B MSATS Screens will be unavailable during this outage

NMI Discovery will not be available during the outage period.
CDR and CDP will not be available during the outage period.

Support Information:
Report any impacts to the AEMO Information and Support Hub or call 1300 236 600.
Please refer to https://aemo.service-now.com/participantportal?id=pp_services_status for any
planned/unplanned maintenance activities .
115135RESERVE NOTICE26/02/2024 02:14:06 PM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 29/02/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 115132 has been updated at 1300 hrs 26/02/2024 to the following:

From 1630 hrs to 2000 hrs 29/02/2024.
The forecast capacity reserve requirement is 1050 MW.
The minimum capacity reserve available is 324 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
115133SETTLEMENTS RESIDUE26/02/2024 12:20:20 PM

[EventId:202402261220_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 26 February 2024 12:20

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1220 hrs on 26 February 2024

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 26 February 2024.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1220 hrs on 26 February 2024.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
115132RESERVE NOTICE26/02/2024 11:41:30 AM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 29/02/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 115130 has been updated at 1100 hrs 26/02/2024 to the following:

From 1630 hrs to 1830 hrs 29/02/2024.
The forecast capacity reserve requirement is 1050 MW.
The minimum capacity reserve available is 230 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
115130RESERVE NOTICE26/02/2024 10:04:05 AM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 29/02/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:

From 1700 hrs to 1800 hrs 29/02/2024.
The forecast capacity reserve requirement is 730 MW.
The minimum capacity reserve available is 678 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
115118SETTLEMENTS RESIDUE25/02/2024 03:00:24 PM

[EventId:202402251500_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 25 February 2024 15:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1500 hrs on 25 February 2024

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 25 February 2024.

Refer to market notice: 115112

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1500 hrs on 25 February 2024.

This is an AEMO autogenerated Market Notice.
115114RESERVE NOTICE25/02/2024 02:32:31 PM

STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 29/02/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 115087 has been updated at 1430 hrs 25/02/2024 to the following:

[1.] From 1800 hrs 29/02/2024 to 1900 hrs 29/02/2024.
The forecast capacity reserve requirement is 1255 MW.
The minimum capacity reserve available is 1152 MW.

Manager NEM Real Time Operations