Cancellation - AEMO Intervention Event - Intervention trading intervals - Direction SA region 04/02/2024
Cancellation - AEMO Intervention Event - Intervention trading intervals - Direction SA region 04/02/2024
Refer Market Notice 114245
The AEMO Intervention Event and all associated directions are cancelled from 1430 hrs 11/02/2024
Manager NEM Real Time Operations
[EventId:202402111300_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 11 February 2024 13:00
Issued by Australian Energy Market Operator Ltd at 1300 hrs on 11 February 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 11 February 2024.
Refer to market notice: 114496
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1300 hrs on 11 February 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202402111205_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 11 February 2024 12:05
Issued by Australian Energy Market Operator Ltd at 1205 hrs on 11 February 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 11 February 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1205 hrs on 11 February 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 13/02/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
[1.] From 1600 hrs 13/02/2024 to 1700 hrs 13/02/2024.
The forecast capacity reserve requirement is 1319 MW.
The minimum capacity reserve available is 1056 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
Possible intervention to manage power system security in SA Region
Possible intervention to manage power system security in SA Region
The synchronous generating units currently expected to be synchronised in SA from 0100 hrs 12/02/2024 will be inadequate to maintain a secure operating state in SA.
AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.
Manager NEM Real Time Operations
Update - Direction - SA Region - 04/02/2024
Update - Direction - SA Region - 04/02/2024
Refer Market Notice 114458
The AEMO intervention event that commenced from interval ending 1635hrs on 04/02/2024 is continuing.
AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.
Manager NEM Real Time Operations
[EventId:202402101430_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 10 February 2024 14:30
Issued by Australian Energy Market Operator Ltd at 1430 hrs on 10 February 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 10 February 2024.
Refer to market notice: 114470
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1430 hrs on 10 February 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202402101305_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 10 February 2024 13:05
Issued by Australian Energy Market Operator Ltd at 1305 hrs on 10 February 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 10 February 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1305 hrs on 10 February 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202402101300_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 10 February 2024 13:00
Issued by Australian Energy Market Operator Ltd at 1300 hrs on 10 February 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 10 February 2024.
Refer to market notice: 114468
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1300 hrs on 10 February 2024.
This is an AEMO autogenerated Market Notice.