Filter by category
Filter by Date
NON-CONFORMANCE Region QLD1 Saturday, 3 February 2024
NON-CONFORMANCE QLD1 Region Saturday, 3 February 2024
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: MPP_2
Duration: 03/02/2024 02:25 to 03/02/2024 02:45
Amount: -36 MW
Constraint: NC-Q_MPP_2
Auto-generated on behalf of Manager NEM Real Time Operations
Update - Direction - SA Region - 28/01/2024
Update - Direction - SA Region - 28/01/2024
Refer Market Notice 113930
The AEMO intervention event that commenced from interval ending 1705 hrs on 28/01/2024 is continuing.
AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 05/02/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 114117 has been updated at 1400 hrs 02/02/2024 to the following:
From 1230 hrs to 1300 hrs 05/02/2024.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 1282 MW.
From 1400 hrs to 2130 hrs 05/02/2024.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 685 MW.
AEMO Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 06/02/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 114118 has been updated at 1400 hrs 02/02/2024 to the following:
From 1230 hrs to 1930 hrs 06/02/2024.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 1156 MW.
AEMO Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 05/02/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 114115 has been updated at 1400 hrs 02/02/2024 to the following:
From 1800 hrs to 1930 hrs 05/02/2024.
The forecast capacity reserve requirement is 1265 MW.
The minimum capacity reserve available is 992 MW.
AEMO Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 06/02/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 114116 has been updated at 1400 hrs 02/02/2024 to the following:
From 1830 hrs to 1900 hrs 06/02/2024.
The forecast capacity reserve requirement is 1263 MW.
The minimum capacity reserve available is 1181 MW.
AEMO Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region [beginning] on 02/02/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 114149 is cancelled at 1300 hrs 02/02/2024.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 02/02/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:
[1.] From 1830 hrs 02/02/2024 to 1900 hrs 02/02/2024.
The forecast capacity reserve requirement is 1188 MW.
The minimum capacity reserve available is 1137 MW.
Manager NEM Real Time Operations
NEM Local Temperature Alerts for NSW, SA, VIC from 02 Feb 2024 to 06 Feb 2024
AEMO's weather service provider has issued forecast temperatures equal to or greater than the NEM Local Temperature Alert Levels for listed weather stations below.
NSW
Mudgee Ap (39+ Deg C): 4th Feb
Yass (39+ Deg C): 4th Feb
SA
Clare High School (39+ Deg C): 4th Feb
Port Augusta Ap (39+ Deg C): 3rd Feb, 4th Feb
VIC
Mildura Ap (39+ Deg C): 4th Feb
The NEM Local Temperature Alert Levels are:
Launceston Ti Tree Bend: 33 Deg C, Dalby Airport: 37 Deg C, for all other selected weather stations: 39 Deg C.
AEMO requests Market Participants to:
1. review the weather forecast in the local area where their generating units / MNSP converter stations are located and,
2. if required, update the available capacity in their dispatch offers or availability submissions consistent with the forecast temperatures.
Further information is available at:
https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-reliability/projected-assessment-of-system-adequacy/nem-local-temperature-alerts
AEMO Operations Planning