Filter by category
Filter by Date
[EventId:202402291645_confirmed] Prices for interval 29-Feb-2024 16:45 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1700 hrs on 29 February 2024
PRICES ARE NOW CONFIRMED for trading interval 29-Feb-2024 16:45.
In accordance with Market Notice 115379 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202402291635_confirmed] Prices for interval 29-Feb-2024 16:35 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1700 hrs on 29 February 2024
PRICES ARE NOW CONFIRMED for trading interval 29-Feb-2024 16:35.
In accordance with Market Notice 115376 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202402291640_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 29 February 2024 16:40
Issued by Australian Energy Market Operator Ltd at 1640 hrs on 29 February 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 29 February 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1640 hrs on 29 February 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202402291630_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 29 February 2024 16:30
Issued by Australian Energy Market Operator Ltd at 1630 hrs on 29 February 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 29 February 2024.
Refer to market notice: 115369
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1630 hrs on 29 February 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202402291440_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 29 February 2024 14:40
Issued by Australian Energy Market Operator Ltd at 1440 hrs on 29 February 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 29 February 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1440 hrs on 29 February 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202402291430_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 29 February 2024 14:30
Issued by Australian Energy Market Operator Ltd at 1430 hrs on 29 February 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 29 February 2024.
Refer to market notice: 115360
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1430 hrs on 29 February 2024.
This is an AEMO autogenerated Market Notice.
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 29/02/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 115358 has been updated at 1415 hrs to the following:
[1.] From 1600 hrs 29/02/2024 to 1830 hrs 29/02/2024.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 957 MW.
Manager NEM Real Time Operations
[EventId:202402291335_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 29 February 2024 13:35
Issued by Australian Energy Market Operator Ltd at 1335 hrs on 29 February 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 29 February 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1335 hrs on 29 February 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 29/02/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 115347 has been updated at 1115 hrs to the following:
[1.] From 1530 hrs 29/02/2024 to 1900 hrs 29/02/2024.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 846 MW.
Manager NEM Real Time Operations