119572RESERVE NOTICE28/10/2024 03:03:28 PM

STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 04/11/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:

From 1730 hrs to 2000 hrs 04/11/2024.
The forecast capacity reserve requirement is 995 MW.
The minimum capacity reserve available is 590 MW.


AEMO Operations
     
119570SETTLEMENTS RESIDUE28/10/2024 01:45:23 PM

[EventId:202410281345_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 28 October 2024 13:45

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1345 hrs on 28 October 2024

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 28 October 2024.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1345 hrs on 28 October 2024.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
119569RESERVE NOTICE28/10/2024 01:47:15 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 28/10/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 119564 has been updated at 1330 hrs to the following:

[1.] From 1800 hrs 28/10/2024 to 1900 hrs 28/10/2024.
The forecast capacity reserve requirement is 1060 MW.
The minimum capacity reserve available is 934 MW.

Manager NEM Real Time Operations
     
119568SETTLEMENTS RESIDUE28/10/2024 01:30:29 PM

[EventId:202410281330_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 28 October 2024 13:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1330 hrs on 28 October 2024

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 28 October 2024.

Refer to market notice: 119562

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1330 hrs on 28 October 2024.

This is an AEMO autogenerated Market Notice.
     
119565RESERVE NOTICE28/10/2024 01:02:18 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 29/10/2024

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following periods:

[1.] From 1730 hrs 29/10/2024 to 1800 hrs 29/10/2024.
The forecast capacity reserve requirement is 955 MW.
The minimum capacity reserve available is 888 MW.

[2.] From 1900 hrs 29/10/2024 to 2000 hrs 29/10/2024.
The forecast capacity reserve requirement is 1041 MW.
The minimum capacity reserve available is 786 MW.

Manager NEM Real Time Operations
     
119564RESERVE NOTICE28/10/2024 12:49:58 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 28/10/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 119535 has been updated at 1230 hrs to the following:

[1.] From 1800 hrs 28/10/2024 to 1900 hrs 28/10/2024.
The forecast capacity reserve requirement is 1059 MW.
The minimum capacity reserve available is 953 MW.

[2.] From 2000 hrs 28/10/2024 to 2130 hrs 28/10/2024.
The forecast capacity reserve requirement is 1053 MW.
The minimum capacity reserve available is 785 MW.

Manager NEM Real Time Operations
     
119562SETTLEMENTS RESIDUE28/10/2024 12:00:33 PM

[EventId:202410281200_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 28 October 2024 12:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1200 hrs on 28 October 2024

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 28 October 2024.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1200 hrs on 28 October 2024.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
119560SETTLEMENTS RESIDUE28/10/2024 11:30:34 AM

[EventId:202410281130_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 28 October 2024 11:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1130 hrs on 28 October 2024

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 28 October 2024.

Refer to market notice: 119559

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1130 hrs on 28 October 2024.

This is an AEMO autogenerated Market Notice.
     
119559SETTLEMENTS RESIDUE28/10/2024 09:55:27 AM

[EventId:202410280955_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 28 October 2024 09:55

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0955 hrs on 28 October 2024

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 28 October 2024.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 0955 hrs on 28 October 2024.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.