[EventId:202410281345_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 28 October 2024 13:45
Issued by Australian Energy Market Operator Ltd at 1345 hrs on 28 October 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 28 October 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1345 hrs on 28 October 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 28/10/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 119564 has been updated at 1330 hrs to the following:
[1.] From 1800 hrs 28/10/2024 to 1900 hrs 28/10/2024.
The forecast capacity reserve requirement is 1060 MW.
The minimum capacity reserve available is 934 MW.
Manager NEM Real Time Operations
[EventId:202410281330_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 28 October 2024 13:30
Issued by Australian Energy Market Operator Ltd at 1330 hrs on 28 October 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 28 October 2024.
Refer to market notice: 119562
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1330 hrs on 28 October 2024.
This is an AEMO autogenerated Market Notice.
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 29/10/2024
[1.] From 1730 hrs 29/10/2024 to 1800 hrs 29/10/2024.
The forecast capacity reserve requirement is 955 MW.
The minimum capacity reserve available is 888 MW.
[2.] From 1900 hrs 29/10/2024 to 2000 hrs 29/10/2024.
The forecast capacity reserve requirement is 1041 MW.
The minimum capacity reserve available is 786 MW.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 28/10/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 119535 has been updated at 1230 hrs to the following:
[1.] From 1800 hrs 28/10/2024 to 1900 hrs 28/10/2024.
The forecast capacity reserve requirement is 1059 MW.
The minimum capacity reserve available is 953 MW.
[2.] From 2000 hrs 28/10/2024 to 2130 hrs 28/10/2024.
The forecast capacity reserve requirement is 1053 MW.
The minimum capacity reserve available is 785 MW.
Manager NEM Real Time Operations
[EventId:202410281200_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 28 October 2024 12:00
Issued by Australian Energy Market Operator Ltd at 1200 hrs on 28 October 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 28 October 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1200 hrs on 28 October 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202410281130_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 28 October 2024 11:30
Issued by Australian Energy Market Operator Ltd at 1130 hrs on 28 October 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 28 October 2024.
Refer to market notice: 119559
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1130 hrs on 28 October 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202410280955_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 28 October 2024 09:55
Issued by Australian Energy Market Operator Ltd at 0955 hrs on 28 October 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 28 October 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 0955 hrs on 28 October 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202410280800_NRM_QLD1_NSW1_stopped] NEGRES CONSTRAINT NRM_QLD1_NSW1 ceased operating from 28 October 2024 08:00
Issued by Australian Energy Market Operator Ltd at 0800 hrs on 28 October 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 28 October 2024.
Refer to market notice: 119537
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the QLD to NSW directional interconnector.
The negative residue constraint NRM_QLD1_NSW1 ceased operating at 0800 hrs on 28 October 2024.
This is an AEMO autogenerated Market Notice.