119367MARKET INTERVENTION25/10/2024 09:58:29 AM

Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT

AEMO ELECTRICITY MARKET NOTICE

Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT

Refer to Market Notice 119373

Direction is cancelled from: 1000 hrs 25/10/2024

Manager NEM Real Time Operations
     
119366MARKET INTERVENTION25/10/2024 08:20:25 AM

Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

AEMO ELECTRICITY PARTICIPANT NOTICE.

Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

Refer AEMO Electricity Market Notice 119336

TORRB3 TORRENS ISLAN at 0930 hrs 25/10/2024 to synchronise and follow dispatch targets.

This update is issued at 0815 hrs 25/10/2024 and is expected to stay in place until 1630 hrs 25/10/2024

Manager NEM Real Time Operations
     
119365MARKET INTERVENTION25/10/2024 08:13:04 AM

Direction - SA region to Pelican Point Power Limited - PPCCGT PELICAN POINT

AEMO ELECTRICITY MARKET NOTICE

Direction - SA region to Pelican Point Power Limited - PPCCGT PELICAN POINT

Refer to Market Notice 119198


In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to Pelican Point Power Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).

Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT at 0815 hrs 25/10/2024
Type of resource: generating unit
Required actions: Remain synchronised and follow dispatch targets at 0830 hrs 25/10/2024
Services provided: Voltage Control
Circumstances necessitating the Direction:Voltage
Circumstances necessitating the Direction additional detail: intervention is required to maintain the power system in a secure operating state
Expected duration: 0930 hrs 25/10/2024.

Pelican Point Power Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.

Manager NEM Real Time Operations
     
119336MARKET INTERVENTION24/10/2024 04:01:42 PM

Direction - to AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE

Direction - to AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

Refer to Market Notice 119198


In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to AGL SA Generation Pty Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).

Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN at 1600 hrs 24/10/2024
Type of resource: generating unit
Required actions: Synchronise and follow dispatch targets at 0830 hrs 25/10/2024
Services provided: Voltage Control
Circumstances necessitating the Direction: Voltage
Circumstances necessitating the Direction additional detail: The synchronous generating units currently expected to be synchronised in SA will be inadequate to maintain sufficient Voltage Control in SA. Intervention is required to maintain the power system in a secure operating state
Expected duration: 1630 hrs 25/10/2024.

AGL SA Generation Pty Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.

Manager NEM Real Time Operations
     
119334MARKET INTERVENTION24/10/2024 04:02:52 PM

Update Direction - AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE.

Update Direction - AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN

Refer AEMO Electricity Participant Notice 119237

The TORRB4 TORRENS ISLAN direction is now expected to stay in place until 1400 hrs 25/10/2024.

The direction update is issued at 1600 hrs 24/10/2024.

Manager NEM Real Time Operations
     
119315MINIMUM SYSTEM LOAD24/10/2024 02:52:43 PM

Forecast Minimum System Load 1 (MSL1) in the VIC Region on 27/10/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the Victorian region on 27/10/2024.

Minimum regional demand is forecast to be 1648 MW at 1300 hrs, and the advisory threshold is:
MSL1 - 1860 MW
MSL2 - 1360 MW
MSL3 - 860 MW

The regional demand is forecast to be below the MSL1 threshold for the following period:
From 1130 hrs to 1400 hrs 27/10/2024.

AEMO Operations
     
119310MARKET INTERVENTION24/10/2024 06:30:06 PM

Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE

Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

Refer to Market Notice 119265

Direction is cancelled from: 1830 hrs 24/10/2024

Manager NEM Real Time Operations
     
119309MARKET INTERVENTION24/10/2024 03:36:54 PM

Cancellation - AEMO Intervention Event - VIC region 24/10/2024

AEMO ELECTRICITY MARKET NOTICE

Cancellation - AEMO Intervention Event - VIC region 24/10/2024

Refer to Market Notice 119272

The AEMO Intervention Event and all associated directions are cancelled from 1535 hrs on 24/10/2024.


Manager NEM Real Time Operations
     
119308MARKET INTERVENTION24/10/2024 03:34:14 PM

Cancellation: Direction issued to: Snowy Hydro Limited - MURR2-3 MURRAY2

AEMO ELECTRICITY MARKET NOTICE

Cancellation: Direction issued to: Snowy Hydro Limited - MURR2-3 MURRAY2

Refer to Market Notice 119293

Direction is cancelled from: 1535 hrs 24/10/2024

Manager NEM Real Time Operations
     