Market Notices

114744MARKET INTERVENTION15/02/2024 10:51:30 AM

Cancellation of Distributed PV Contingency 1 (DPVC1) in the SA Region on 15/02/2024

AEMO ELECTRICITY MARKET NOTICE

Cancellation - DPVC1 - SA Region

Refer Market Notice 114743

The DPVC1 condition for 15/02/2024 is cancelled at 1045 hrs 15/02/2024.

Manager NEM Real Time Operations
114743MARKET INTERVENTION15/02/2024 09:21:02 AM

DPV Contingency 1 (DPVC1) in the SA Region on 15/02/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO has detected there is an elevated risk of the contingent disconnection of Distributed PV (DPV) which, together with the risk of loss of scheduled generation, exceeds secure thresholds in the South Australia region from 1330 hrs 15/02/2024 to 1430 hrs 15/02/2024.

Maximum DPV generation forecast by the Australian Solar Energy Forecasting System 2 (ASEFS2) is 1716 MW at 1400 hrs and the secure ASEFS2 DPV generation limit for the forecast operating conditions is 1752 MW.

AEMO is seeking a market response.

An insufficient market response may require AEMO to take action or intervene to maintain power system security in South Australia. This may result in action such as the recall of planned outages, direction of scheduled generation, curtailment of non-scheduled wind generation, and an instruction / direction to maintain DPV generation below a secure DPV generation threshold.

AEMO estimates the latest time at which it may need to intervene through an AEMO intervention event is 1230 hrs on 15/02/2024.

Manager NEM Real Time Operations
114742GENERAL NOTICE15/02/2024 07:29:34 AM

QNI Minor testing (NSW to Qld) 15th February 2024

AEMO ELECTRICITY MARKET NOTICE

Refer to market notice 114415

There is an opportunity for testing QNI Minor for flows from NSW to Qld up to 750 MW on Wednesday 15th February 2024 from 0730 to 1500hrs.

This test includes a trip and reclose of a line in northern NSW.

Please also refer to the published formal QNI minor testing information at the following link:
https://www.aemo.com.au/consultations/current-and-closed-consultations/qld-to-nsw-interconnector-qni-upgrade

Ben Blake
AEMO Operations
114741MARKET INTERVENTION15/02/2024 05:15:36 AM

Cancellation of Distributed PV Contingency 1 (DPVC1) in the SA Region on 15/02/2024

AEMO ELECTRICITY MARKET NOTICE

Cancellation - DPVC1 - SA Region

Refer Market Notice 114740

The DPVC1 condition for 15/02/2024 is cancelled at 0510 hrs 15/02/2024.

Manager NEM Real Time Operations
114740MARKET INTERVENTION15/02/2024 01:41:43 AM

DPV Contingency 1 (DPVC1) in the SA Region on 15/02/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO has detected there is an elevated risk of the contingent disconnection of Distributed PV (DPV) which, together with the risk of loss of scheduled generation, exceeds secure thresholds in the South Australia region from 1230 hrs 15/02/2024 to 1400 hrs 15/02/2024.
Maximum DPV generation forecast by the Australian Solar Energy Forecasting System 2 (ASEFS2) is 1737 MW at 1330 hrs and the secure ASEFS2 DPV generation limit for the forecast operating conditions is 1796 MW.

AEMO is seeking a market response.

An insufficient market response may require AEMO to take action or intervene to maintain power system security in South Australia. This may result in action such as the recall of planned outages, direction of scheduled generation, curtailment of non-scheduled wind generation, and an instruction / direction to maintain DPV generation below a secure DPV generation threshold.
AEMO estimates the latest time at which it may need to intervene through an AEMO intervention event is 1130 hrs on 15/02/2024.

Manager NEM Real Time Operations
114724MARKET INTERVENTION14/02/2024 05:59:52 PM

Cancellation - AEMO Intervention Event - Intervention trading intervals - Direction SA region 12/02/2024

AEMO ELECTRICITY MARKET NOTICE

Cancellation - AEMO Intervention Event - Intervention trading intervals - Direction SA region 12/02/2024

Refer Market Notice 114536

The AEMO Intervention Event and all associated directions are cancelled from 1800 hrs 14/02/2024

Manager NEM Real Time Operations
114721MARKET INTERVENTION14/02/2024 03:33:20 PM

Direction - SA region 14/02/2024

AEMO ELECTRICITY MARKET NOTICE.

Direction - SA region 14/02/2024

In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a).

The direction was necessary to maintain the power system in a secure operating state.

AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.

The issue of the direction commences an AEMO intervention event. AEMO declares all trading intervals during the event to be intervention trading intervals, commencing from the interval ending 1535 hrs on 14/02/2024.

Intervention pricing does not apply to this AEMO intervention event.

Manager NEM Real Time Operations
114717MARKET INTERVENTION14/02/2024 02:48:32 PM

Possible intervention to manage power system security in South Australia (SA) Region

AEMO ELECTRICITY MARKET NOTICE

Possible intervention to manage power system security in SA region

The synchronous generating units currently expected to be synchronised in SA from 0815 hrs 15/02/2024 will be inadequate to maintain a secure operating state in SA .

AEMO estimates that, in the absence of sufficient market response by 1530 hrs 14/02/2024, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.

Manager NEM Real Time Operations
114713SETTLEMENTS RESIDUE14/02/2024 02:00:26 PM

[EventId:202402141400_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 14 February 2024 14:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1400 hrs on 14 February 2024

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 14 February 2024.

Refer to market notice: 114708

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1400 hrs on 14 February 2024.

This is an AEMO autogenerated Market Notice.