113879SETTLEMENTS RESIDUE27/01/2024 06:06:28 PM

[EventId:202401271805_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 27 January 2024 18:05

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1805 hrs on 27 January 2024

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 27 January 2024.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1805 hrs on 27 January 2024.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
113872RESERVE NOTICE27/01/2024 05:39:16 PM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 30/01/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 113842 has been updated at 1700 hrs 27/01/24 to the following:

From 0800 hrs 30/01/2024 to 1600 hrs 30/01/2024.
The forecast capacity reserve requirement is 845 MW.
The minimum capacity reserve available is 516 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
113870MARKET INTERVENTION27/01/2024 08:55:08 PM

Cancellation - AEMO Intervention Event - Intervention trading intervals - Direction QLD region 27/01/2024

AEMO ELECTRICITY MARKET NOTICE

Cancellation - AEMO Intervention Event - Intervention trading intervals - Direction QLD region 27/01/2024

Refer Market Notice 113839

The AEMO Intervention Event and all associated directions are cancelled from 2100 hrs 27/01/2024

Manager NEM Real Time Operations
113867MARKET INTERVENTION27/01/2024 05:01:19 PM

Update - Direction - SA Region - 24/01/2024

AEMO ELECTRICITY MARKET NOTICE

Update - Direction - SA Region - 24/01/2024

Refer Market Notice 113710

The AEMO intervention event that commenced from interval ending 1635 hrs on 24/01/2024 is continuing.

AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.

Manager NEM Real Time Operations
113865RESERVE NOTICE27/01/2024 03:50:28 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 27/01/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 113853 is cancelled at 1530 hrs 27/01/2024.

Manager NEM Real Time Operations
113860POWER SYSTEM EVENTS27/01/2024 02:49:35 PM

Cancellation - Non-credible contingency event - QLD region - 27/01/2024

AEMO ELECTRICITY MARKET NOTICE.

Cancellation - Non-credible contingency event - QLD region - 27/01/2024

Refer AEMO Electricity Market Notice 113825

At 0138 hrs the Gin Gin (H6) No.2 275 kV Busbar tripped.

AEMO has received further information and now determines this was not a non-credible contingency event.

Manager NEM Real Time Operations
113853RESERVE NOTICE27/01/2024 02:19:30 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 27/01/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 113840 has been updated at 1400 hrs to the following:

[From 1900 hrs 27/01/2024 to 1930 hrs 27/01/2024.
The forecast capacity reserve requirement is 520 MW.
The minimum capacity reserve available is 514 MW.

AEMO is seeking a market response.

Manager NEM Real Time Operations
113846MARKET INTERVENTION27/01/2024 12:41:49 PM

INTENTION TO IMPLEMENT an AEMO INTERVENTION EVENT WITH RERT

AEMO ELECTRICITY MARKET NOTICE.

AEMO Intervention Event, Reliability and Emergency Reserve Trader (RERT) - QLD1 Region - 27/01/2024

Refer to AEMO Electricity Market Notice no. 113841.
AEMO has entered into a reserve contract and may implement a AEMO Intervention Event by dispatching that reserve contract to maintain the power system in a Reliable operating state during the following period of time;
17:30 to 21:00 hrs 27/01/2024
If reserve is required, the period of activation or dispatch will be within this period, but may not be for all the entire period.
AEMO will issue a further advice if the reserve contract is dispatched/activated.


Manager NEM Real Time Operations
113843SETTLEMENTS RESIDUE27/01/2024 12:00:27 PM

[EventId:202401271200_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 27 January 2024 12:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1200 hrs on 27 January 2024

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 27 January 2024.

Refer to market notice: 113832

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1200 hrs on 27 January 2024.