STPASA - Suspect Lack Of Reserve Level 2 (LOR2) in the QLD Region on 01/02/2024
AEMO considers that there are suspect Forecast LOR2 conditions for the QLD region for the following periods:
1. From 0800 hrs to 1000 hrs 01/02/2024.
The forecast capacity reserve requirement is 188 MW.
The minimum capacity reserve available is 123 MW.
2. From 1130 hrs to 1200 hrs 01/02/2024.
The forecast capacity reserve requirement is 177 MW.
The minimum capacity reserve available is 119 MW.
AEMO is currently investigating these LOR2 forecast conditions to confirm whether they are valid.
This market notice overrides the suspect LOR3 conditions advised in market notice 113958.
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 01/02/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following periods:
1. From 0830 hrs to 0900 hrs 01/02/2024.
The forecast capacity reserve requirement is 206 MW.
The minimum capacity reserve available is 180 MW.
2. From 1000 hrs to 1100 hrs 01/02/2024.
The forecast capacity reserve requirement is 179 MW.
The minimum capacity reserve available is 29 MW.
3. From 1200 hrs to 1300 hrs 01/02/2024.
The forecast capacity reserve requirement is 175 MW.
The minimum capacity reserve available is 14 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 30/01/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following periods:
1. From 1000 hrs to 1330 hrs 30/01/2024.
The forecast capacity reserve requirement is 699 MW.
The minimum capacity reserve available is 653 MW.
2. From 1400 hrs to 1500 hrs 30/01/2024.
The forecast capacity reserve requirement is 673 MW.
The minimum capacity reserve available is 642 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 29/01/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 113956 is cancelled at 0500 hrs 29/01/2024.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 29/01/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 113931 has been updated at 2345 hrs 28/01/2024 to the following:
[1.] From 1730 hrs 29/01/2024 to 1900 hrs 29/01/2024.
The forecast capacity reserve requirement is 1049 MW.
The minimum capacity reserve available is 998 MW.
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 30/01/2024
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice 113904 is cancelled at 2340 hrs 28/01/2024.
No LOR2 condition is currently forecast in the STPASA period.
Manager NEM Real Time Operations
[EventId:202401281900_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 28 January 2024 19:00
Issued by Australian Energy Market Operator Ltd at 1900 hrs on 28 January 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 28 January 2024.
Refer to market notice: 113938
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1900 hrs on 28 January 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202401281810_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 28 January 2024 18:10
Issued by Australian Energy Market Operator Ltd at 1810 hrs on 28 January 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 28 January 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1810 hrs on 28 January 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 29/01/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:
[1.] From 1700 hrs 29/01/2024 to 2130 hrs 29/01/2024.
The forecast capacity reserve requirement is 1073 MW.
The minimum capacity reserve available is 843 MW.
Manager NEM Real Time Operations