Possible intervention to manage power system security in SA region
Possible intervention to manage power system security in SA region
The synchronous generating units currently expected to be synchronised in SA from 0830 hrs 16/02/2024 will be inadequate to maintain a secure operating state in SA .
AEMO estimates that, in the absence of sufficient market response by 2200 hrs 15/02/2024, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.
Manager NEM Real Time Operations
Cancellation - AEMO Intervention Event - Intervention trading intervals - Direction SA region 14/02/2024
Cancellation - AEMO Intervention Event - Intervention trading intervals - Direction SA region 14/02/2024
Refer Market Notice 114721
The AEMO Intervention Event and all associated directions are cancelled from 2300 hrs 15/02/2024
Manager NEM Real Time Operations
Cancellation of a Non-Credible Contingency Event: Armidale - Dumaresq 8C 330kV line and Armidale - Sapphire WF 8E 330kV line in NSW1 due to Lightning.
Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: NSW1
Lines: Armidale - Dumaresq 8C 330kV and Armidale - Sapphire WF 8E 330kV
Cancellation time: 15/02/2024 19:34
Constraint set(s) revoked:
N-ARDM_ARSR_1PH_N-2 Constraint set contains the following interconnector(s) on the left hand side:
N-Q-MNSP1
NSW1-QLD1
Refer AEMO Electricity Market Notice 114758
Auto-generated on behalf of Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Bayswater - Mt Piper No.5A3 500kV line and Wollar - Mt Piper No.5A5 500kV line in NSW1 due to Lightning.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: NSW1
Lines: Bayswater - Mt Piper No.5A3 500kV and Wollar - Mt Piper No.5A5 500kV
Duration: 15/02/2024 19:21 until further notice
Constraint set(s) invoked:
NONE
Auto-generated on behalf of Manager NEM Real Time Operations
Cancellation - AEMO Intervention Event - Intervention trading intervals - Direction VIC region 14/02/2024
Cancellation - AEMO Intervention Event - Intervention trading intervals - Direction VIC region 14/02/2024
Refer Market Notice 114697
The AEMO Intervention Event and all associated directions are cancelled from 1905 hrs 15/02/2024
Manager NEM Real Time Operations
Update - Direction - SA Region - 14/02/2024
Update - Direction - SA Region - 14/02/2024
Refer Market Notice 114721
The AEMO intervention event that commenced from interval ending 1535 hrs on 14/02/2024 is continuing.
AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.
Manager NEM Real Time Operations
Cancellation of Distributed PV Contingency 3 (DPVC3), Distributed PV Contingency 2 (DPVC2) and Distributed PV Contingency 1 (DPVC1) condition in the SA Region on 15/02/2024.
Cancellation - DPVC3, DPVC2 and DPVC1 - SA Region
Refer Market Notice 114751 for DPVC3, 114753 for DPVC2 and 114746 for DPVC1.
The DPVC3, DPVC2 and DPVC1 condition for 15/02/2024 is cancelled at 1415 hrs 15/02/2024.
Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Armidale - Dumaresq 8C 330kV line and Armidale - Sapphire WF 8E 330kV line in NSW1 due to Lightning.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: NSW1
Lines: Armidale - Dumaresq 8C 330kV and Armidale - Sapphire WF 8E 330kV
Duration: 15/02/2024 13:31 until further notice
Constraint set(s) invoked:
N-ARDM_ARSR_1PH_N-2 Constraint set contains the following interconnector(s) on the left hand side:
N-Q-MNSP1
NSW1-QLD1
Auto-generated on behalf of Manager NEM Real Time Operations
Update - Distributed PV Contingency 3 (DPVC3) in the SA Region on 15/02/2024
Update - Distributed PV Contingency 3 (DPVC3) in the SA Region on 15/02/2024
Refer AEMO Electricity Participant Notice 114751
Distributed PV curtailment is occurring in the SA region to maintain system security due to a Distributed PV Contingency condition.
The instruction direction under National Electricity Law s116 to maintain demand above the required threshold is now expected to end at 1430 hrs 15/02/2024.
Manager NEM Real Time Operations