114672RECLASSIFY CONTINGENCY13/02/2024 06:24:56 PM

Cancellation of a Non-Credible Contingency Event: Palmerston - Hadspen 3 & 4 110kV line and line in TAS1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: TAS1

Lines: Palmerston - Hadspen 3 & 4 110kV and

Cancellation time: 13/02/2024 18:24

Constraint set(s) revoked:
T-HAPM_110_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NONE


Refer AEMO Electricity Market Notice 114640

Auto-generated on behalf of Manager NEM Real Time Operations
114670RECLASSIFY CONTINGENCY13/02/2024 05:54:52 PM

Cancellation of a Non-Credible Contingency Event: Bayswater - Mt Piper No.5A3 500kV line and Wollar - Mt Piper No.5A5 500kV line in NSW1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: NSW1

Lines: Bayswater - Mt Piper No.5A3 500kV and Wollar - Mt Piper No.5A5 500kV

Cancellation time: 13/02/2024 17:54

Constraint set(s) revoked:
NONE

Refer AEMO Electricity Market Notice 114558

Auto-generated on behalf of Manager NEM Real Time Operations
114658MARKET INTERVENTION13/02/2024 05:31:26 PM

Update - Direction - SA Region - 12/02/2024

AEMO ELECTRICITY MARKET NOTICE

Update - Direction - SA Region - 12/02/2024

Refer Market Notice 114536

The AEMO intervention event that commenced from interval ending 1705 hrs on 12/02/2024 is continuing.

AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.

Manager NEM Real Time Operations
114656MARKET INTERVENTION13/02/2024 05:38:24 PM

Direction - VIC region 13/02/2024

AEMO ELECTRICITY MARKET NOTICE.

Direction - VIC region 13/02/2024

In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the VIC region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a).

The direction was necessary to maintain the power system in a secure operating state.

AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.

The issue of the direction commences an AEMO intervention event. AEMO declares all trading intervals during the event to be intervention trading intervals, commencing from the interval ending 1735 hrs on 13/02/2024.

Intervention pricing does not apply to this AEMO intervention event.

Manager NEM Real Time Operations
114649RECLASSIFY CONTINGENCY13/02/2024 05:14:55 PM

Cancellation of a Non-Credible Contingency Event: Collinsville - Stoney Creek 7306 132KV LINE line and Collinsville - Newlands 7121 132KV LINE line in QLD1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: QLD1

Lines: Collinsville - Stoney Creek 7306 132KV LINE and Collinsville - Newlands 7121 132KV LINE

Cancellation time: 13/02/2024 17:14

Constraint set(s) revoked:
NONE

Refer AEMO Electricity Market Notice 114630

Auto-generated on behalf of Manager NEM Real Time Operations
114648MARKET INTERVENTION13/02/2024 05:21:13 PM

Possible intervention to manage power system security in VIC region

AEMO ELECTRICITY MARKET NOTICE

Possible intervention to manage power system security in VIC region

The synchronous generating units currently expected to be synchronised in VIC from 1830 hrs 13/02/2024 will be inadequate to maintain a secure operating state in VIC .

AEMO estimates that, in the absence of sufficient market response by 1730 hrs 13/02/2024, AEMO may need to intervene by issuing a direction requiring one or more VIC synchronous generating unit(s) to operate or remain synchronised to maintain power system security in VIC.

Manager NEM Real Time Operations
114647RECLASSIFY CONTINGENCY13/02/2024 04:33:56 PM

Reclassification of a Non-Credible Contingency Event: Norwood -Scottsdale 110kV line and the Norwood - Scottsdale -Derby 110kV line in TAS due to Non-Credible Event

AEMO ELECTRICITY MARKET NOTICE.

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Non-Credible Event. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: TAS

Lines: Norwood -Scottsdale 110kV line and the Norwood - Scottsdale -Derby 110kV line

Duration: 13/02/2024 16:30 until further notice

Manager NEM Real Time Operations
114641RECLASSIFY CONTINGENCY13/02/2024 03:27:46 PM

Reclassification of non-credible contingency event due to existence of widespread abnormal conditions - VIC region(s).

AEMO ELECTRICITY MARKET NOTICE.

AEMO has identified that a non-credible contingency event impacting the power system is more likely to occur and is considered reasonably possible because of the existence of widespread abnormal conditions namely severe weather in the VIC region.

AEMO has therefore reclassified the occurrence of a non-credible contingency event involving multiple plant due to these abnormal conditions as credible.

Need for further measures is being monitored and further measures may be implemented in line with the Power System Security Guidelines (SO_OP_3715).

Manager NEM Real Time Operations
114640RECLASSIFY CONTINGENCY13/02/2024 03:21:30 PM

Reclassification of a Non-Credible Contingency Event: Palmerston - Hadspen 3 & 4 110kV line and line in TAS1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: TAS1

Lines: Palmerston - Hadspen 3 & 4 110kV and

Duration: 13/02/2024 15:21 until further notice

Constraint set(s) invoked:
T-HAPM_110_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NONE


Auto-generated on behalf of Manager NEM Real Time Operations
X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm