STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 26/01/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 113685 has been updated at 1300 hrs 24/01/2024 to the following:
From 1830 hrs 26/01/2024 to 2000 hrs 26/01/2024.
The forecast capacity reserve requirement is 1326 MW.
The minimum capacity reserve available is 730 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 25/01/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:
[1.] From 1500 hrs 25/01/2024 to 1530 hrs 25/01/2024.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 1349 MW.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 25/01/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:
[1.] From 1530 hrs 25/01/2024 to 1900 hrs 25/01/2024.
The forecast capacity reserve requirement is 1229 MW.
The minimum capacity reserve available is 838 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 27/01/2024
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 113686 has been updated at 1200 hrs 24/01/2024 to the following:
From 1730 hrs 27/01/2024 to 2000 hrs 27/01/2024.
The forecast capacity reserve requirement is 724 MW.
The minimum capacity reserve available is 504 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 26/01/2024
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 113690 is cancelled at 1000 hrs 24/01/2024.
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 25/01/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following periods:
[1.] From 1730 hrs 25/01/2024 to 1800 hrs 25/01/2024.
The forecast capacity reserve requirement is 1248 MW.
The minimum capacity reserve available is 1205 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region beginning on 26/01/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following periods:
[1.] From 1800 hrs 26/01/2024 to 2000 hrs 26/01/2024.
The forecast capacity reserve requirement is 727 MW.
The minimum capacity reserve available is 653 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 26/01/2024
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 113682 is cancelled at 0800 hrs 24/01/2024.
AEMO Operations
Cancellation of a Non-Credible Contingency Event: Eildon PS - Mt Beauty No.1 220 kV line and Eildon PS - Mt Beauty No.2 220 kV line in VIC1 due to Lightning.
Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: VIC1
Lines: Eildon PS - Mt Beauty No.1 220 kV and Eildon PS - Mt Beauty No.2 220 kV
Cancellation time: 24/01/2024 08:24
Constraint set(s) revoked:
NONE
Refer AEMO Electricity Market Notice 113683