114258PRICES UNCHANGED04/02/2024 05:34:58 PM

[EventId:202402041715_confirmed] Prices for interval 04-Feb-2024 17:15 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1730 hrs on 4 February 2024

PRICES ARE NOW CONFIRMED for trading interval 04-Feb-2024 17:15.

In accordance with Market Notice 114253 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
114257PRICES UNCHANGED04/02/2024 05:30:16 PM

[EventId:202402041705_confirmed] Prices for interval 04-Feb-2024 17:05 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1730 hrs on 4 February 2024

PRICES ARE NOW CONFIRMED for trading interval 04-Feb-2024 17:05.

In accordance with Market Notice 114251 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
114250RESERVE NOTICE04/02/2024 04:50:31 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 05/02/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:

[1.] From 1830 hrs 05/02/2024 to 1900 hrs 05/02/2024.
The forecast capacity reserve requirement is 1263 MW.
The minimum capacity reserve available is 1166 MW.


Manager NEM Real Time Operations
114248RESERVE NOTICE04/02/2024 03:56:25 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 05/02/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 114236 has been updated at 1550 hrs to the following:

[1.] From 1430 hrs 05/02/2024 to 1500 hrs 05/02/2024.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 1198 MW.

[2.] From 1730 hrs 05/02/2024 to 1830 hrs 05/02/2024.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 960 MW.

Manager NEM Real Time Operations
114247RESERVE NOTICE04/02/2024 03:37:34 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 05/02/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 114238 is cancelled at 1515 hrs 04/02/2024.

Manager NEM Real Time Operations
114246RESERVE NOTICE04/02/2024 03:12:14 PM

STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 06/02/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 114208 has been updated at 1500 hrs 04/02/2024 to the following:

[1.] From 1830 hrs 06/02/2024 to 1900 hrs 06/02/2024.
The forecast capacity reserve requirement is 1258 MW.
The minimum capacity reserve available is 1166 MW.


Manager NEM Real Time Operations
114242RECLASSIFY CONTINGENCY04/02/2024 02:01:20 PM

Reclassification of a Non-Credible Contingency Event: Chalumbin - Turkinje No.7165 132 kV line and Chalumbin - Turkinje No.7166 132 kV line in QLD1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: QLD1

Lines: Chalumbin - Turkinje No.7165 132 kV and Chalumbin - Turkinje No.7166 132 kV

Duration: 04/02/2024 14:01 until further notice

Constraint set(s) invoked:
NONE

Auto-generated on behalf of Manager NEM Real Time Operations
114240RESERVE NOTICE04/02/2024 01:54:07 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 04/02/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 114233 is cancelled at 1330 hrs 04/02/2024.

Manager NEM Real Time Operations
114239RECLASSIFY CONTINGENCY04/02/2024 01:20:20 PM

Reclassification of a Non-Credible Contingency Event: Tumoulin - Woree No.877 275 kV line and Chalumbin - Turkinje No.7166 132 kV line in QLD1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: QLD1

Lines: Tumoulin - Woree No.877 275 kV and Chalumbin - Turkinje No.7166 132 kV

Duration: 04/02/2024 13:20 until further notice

Constraint set(s) invoked:
NONE

Auto-generated on behalf of Manager NEM Real Time Operations