[EventId:202312151430_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 15 December 2023 14:30
Issued by Australian Energy Market Operator Ltd at 1430 hrs on 15 December 2023
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 15 December 2023.
Refer to market notice: 112378
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1430 hrs on 15 December 2023.
This is an AEMO autogenerated Market Notice.
Direction - SA region 15/12/2023
Direction - SA region 15/12/2023
In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a).
The direction was necessary to maintain the power system in a secure operating state.
AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.
The issue of the direction commences an AEMO intervention event. AEMO declares all trading intervals during the event to be intervention trading intervals, commencing from the interval ending 1450 hrs on 15/12/2023.
Intervention pricing does not apply to this AEMO intervention event.
Manager NEM Real Time Operations
Update - Possible intervention to manage power system security in SA region
Update - Possible intervention to manage power system security in SA region
Refer AEMO Electricity Market Notice 112377
The synchronous generating units currently expected to be synchronised in SA from 0630 hrs 16/12/2023 will be inadequate to maintain a secure operating state in SA .
AEMO estimates that, in the absence of sufficient market response by 1445 hrs 15/12/2023, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.
Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Armidale - Dumaresq 8C 330kV line and Armidale - Sapphire WF 8E 330kV line in NSW1 due to Lightning.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: NSW1
Lines: Armidale - Dumaresq 8C 330kV and Armidale - Sapphire WF 8E 330kV
Duration: 15/12/2023 12:58 until further notice
Constraint set(s) invoked:
N-ARDM_ARSR_1PH_N-2 Constraint set contains the following interconnector(s) on the left hand side:
N-Q-MNSP1
NSW1-QLD1
Auto-generated on behalf of Manager NEM Real Time Operations
[EventId:202312151235_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 15 December 2023 12:35
Issued by Australian Energy Market Operator Ltd at 1235 hrs on 15 December 2023
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 15 December 2023.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1235 hrs on 15 December 2023.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
Possible intervention to manage power system security in South Australia (SA) Region
Possible intervention to manage power system security in South Australia (SA) Region
The synchronous generating units currently expected to be synchronised in SA from 0700 hrs 16/12/2023 will be inadequate to maintain sufficient system strength in SA and hence a secure operating state.
AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.
Manager NEM Real Time Operations
[EventId:202312151200_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 15 December 2023 12:00
Issued by Australian Energy Market Operator Ltd at 1200 hrs on 15 December 2023
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 15 December 2023.
Refer to market notice: 112372
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1200 hrs on 15 December 2023.
This is an AEMO autogenerated Market Notice.
Cancellation of a Non-Credible Contingency Event: Edmonton - Woree 7284 132 kV Line, Barron Gorge - Kamerunga 7143 132 kV Line and the Barron Gorge - Kamerunga 7184 132 kV Line in QLD Region
Cancellation of the reclassification of a Non-Credible contingency event as a Credible contingency event in the Qld region.
Based on the advice from the asset owner, AEMO considers the trip of the Edmonton - Woree 7284 132 kV Line , Barron Gorge - Kamerunga 7143 132 kV Line and the Barron Gorge - Kamerunga 7184 132 kV Line is no longer reasonably possible. Accordingly, its classification has reverted to a non-credible contingency event.
Region: QLD
Elements: Edmonton - Woree 7284 132 kV Line, Barron Gorge - Kamerunga 7143 132 kV Line and the Barron Gorge - Kamerunga 7184 132 kV Line
Cancellation time: 1200 hrs 15/12/2023
Constraint set(s) revoked: Nil
Refer AEMO Electricity Market Notice 102439
Manager NEM Real Time Operations
Cancellation of the Reclassification of a Non Credible Contingency event to a Credible Event - Kareeya Power Station - Qld Region
Cancellation of the reclassification of a Non-Credible contingency event as a Credible contingency event in the Qld region.
Based on the advice from the asset owner, AEMO considers the trip of the Kareeya Power Station Units 1,2,3 and 4 is no longer reasonably possible. Accordingly, its classification has reverted to a non-credible contingency event.
Region: QLD
Elements: Kareeya Power Station Units 1,2,3 and 4
Cancellation time: 1130 hrs 15/12/2023
Constraint set(s) revoked: Nil
Refer AEMO Electricity Market Notice 111965
Manager NEM Real Time Operations