PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 29/02/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 115291 has been updated at 1630 hrs to the following:
[1.] From 1530 hrs 29/02/2024 to 1600 hrs 29/02/2024.
The forecast capacity reserve requirement is 1360 MW.
The minimum capacity reserve available is 1158 MW.
[2.] From 1830 hrs 29/02/2024 to 1900 hrs 29/02/2024.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 1087 MW.
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 29/02/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 115212 is cancelled at 1400 hrs 28/02/2024.
No LOR condition is currently forecast in the QLD region in the STPASA period.
AEMO Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 29/02/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:
[1.] From 1530 hrs 29/02/2024 to 1600 hrs 29/02/2024.
The forecast capacity reserve requirement is 1360 MW.
The minimum capacity reserve available is 1162 MW.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 29/02/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 115147 has been updated at 1400 hrs 27/02/2024 to the following:
From 2130 hrs to 2200 hrs 29/02/2024.
The forecast capacity reserve requirement is 1735 MW.
The minimum capacity reserve available is 1636 MW.
AEMO Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 29/02/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 115145 has been updated at 1400 hrs 27/02/2024 to the following:
1. From 1700 hrs to 1730 hrs 29/02/2024.
The forecast capacity reserve requirement is 1257 MW.
The minimum capacity reserve available is 968 MW.
2. From 2000 hrs to 2030 hrs 29/02/2024.
The forecast capacity reserve requirement is 1267 MW.
The minimum capacity reserve available is 923 MW.
AEMO Operations
Request for Generator Recall Information for 29/02/2024 for QLD Region
Refer to AEMO Electricity Market Notice no. 115193. Additional generation in QLD could assist in alleviating the forecast LOR2 condition in NSW.
Please provide Generator Recall Information for the period 29/02/2024, by 1200 hrs 28/02/2024 via the Generator Recall communication system, in accordance with clause 4.8.5A of the National Electricity Rules.
SO_OP_3719 Procedure for Submitting Generator Outage Recall Information is available at:
https://aemo.com.au/-/media/files/electricity/nem/security_and_reliability/power_system_ops/procedures/so_op_3719-procedure-for-submitting-recall-information-scheduled-generator-outages.pdf
Procedure on how to use Generator Recall in the EMMS Markets Portal is available at
http://www.aemo.com.au/-/media/Files/Electricity/NEM/IT-Systems-and-Change/2018/Guide-to-Generator-Recall-Plans.pdf
AEMO Operations
Request for Generator Recall Information for 29/02/2024 for NSW Region
Refer to AEMO Electricity Market Notice no. 115193.
Please provide Generator Recall Information for the period 29/02/2024, by 1200 hrs 28/02/2024 via the Generator Recall communication system, in accordance with clause 4.8.5A of the National Electricity Rules.
SO_OP_3719 Procedure for Submitting Generator Outage Recall Information is available at:
https://aemo.com.au/-/media/files/electricity/nem/security_and_reliability/power_system_ops/procedures/so_op_3719-procedure-for-submitting-recall-information-scheduled-generator-outages.pdf
Procedure on how to use Generator Recall in the EMMS Markets Portal is available at
http://www.aemo.com.au/-/media/Files/Electricity/NEM/IT-Systems-and-Change/2018/Guide-to-Generator-Recall-Plans.pdf
AEMO Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 26/02/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 115148 has been updated at 1615 hrs to the following:
[1.] From 1800 hrs 26/02/2024 to 1900 hrs 26/02/2024.
The forecast capacity reserve requirement is 1155 MW.
The minimum capacity reserve available is 827 MW.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 26/02/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:
[1.] From 1800 hrs 26/02/2024 to 1900 hrs 26/02/2024.
The forecast capacity reserve requirement is 1124 MW.
The minimum capacity reserve available is 974 MW.
Manager NEM Real Time Operations