115391RESERVE NOTICE29/02/2024 05:24:39 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 29/02/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:

[1.] From 1800 hrs 29/02/2024 to 1900 hrs 29/02/2024.
The forecast capacity reserve requirement is 1260 MW.
The minimum capacity reserve available is 1035 MW.


Manager NEM Real Time Operations
115365RESERVE NOTICE29/02/2024 02:20:05 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 29/02/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 115358 has been updated at 1415 hrs to the following:

[1.] From 1600 hrs 29/02/2024 to 1830 hrs 29/02/2024.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 957 MW.

Manager NEM Real Time Operations
115358RESERVE NOTICE29/02/2024 11:25:21 AM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 29/02/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 115347 has been updated at 1115 hrs to the following:

[1.] From 1530 hrs 29/02/2024 to 1900 hrs 29/02/2024.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 846 MW.

Manager NEM Real Time Operations
115347RESERVE NOTICE29/02/2024 12:51:06 AM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 29/02/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 115302 has been updated at 0050 hrs to the following:

[1.] From 1500 hrs 29/02/2024 to 1630 hrs 29/02/2024.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 822 MW.

[2.] From 1800 hrs 29/02/2024 to 1900 hrs 29/02/2024.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 852 MW.

Manager NEM Real Time Operations
115302RESERVE NOTICE28/02/2024 05:09:56 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 29/02/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 115291 has been updated at 1630 hrs to the following:

[1.] From 1530 hrs 29/02/2024 to 1600 hrs 29/02/2024.
The forecast capacity reserve requirement is 1360 MW.
The minimum capacity reserve available is 1158 MW.

[2.] From 1830 hrs 29/02/2024 to 1900 hrs 29/02/2024.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 1087 MW.


Manager NEM Real Time Operations
115292RESERVE NOTICE28/02/2024 03:15:54 PM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 29/02/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 115212 is cancelled at 1400 hrs 28/02/2024.

No LOR condition is currently forecast in the QLD region in the STPASA period.

AEMO Operations
115291RESERVE NOTICE28/02/2024 01:51:53 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 29/02/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:

[1.] From 1530 hrs 29/02/2024 to 1600 hrs 29/02/2024.
The forecast capacity reserve requirement is 1360 MW.
The minimum capacity reserve available is 1162 MW.


Manager NEM Real Time Operations
115270POWER SYSTEM EVENTS28/02/2024 12:17:11 PM

Non-credible contingency event - QLD region - 28/02/2024

AEMO ELECTRICITY MARKET NOTICE.

Non-credible contingency event - QLD region - 28/02/2024

At 1029 hrs the Tully - Cardwell No.7389 132 kV Line tripped and auto reclosed and Ross - Woree No. 8905 275 kV Line tripped and auto reclosed.

AEMO did not instruct load shedding.

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event is not known at this stage.


Manager NEM Real Time Operations
115213RESERVE NOTICE27/02/2024 03:02:19 PM

STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 29/02/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 115147 has been updated at 1400 hrs 27/02/2024 to the following:

From 2130 hrs to 2200 hrs 29/02/2024.
The forecast capacity reserve requirement is 1735 MW.
The minimum capacity reserve available is 1636 MW.