Filter by category
Filter by Date
Direction - SA region 06/08/2024
Direction - SA region 06/08/2024
Refer to Market Notice 117568
In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to AGL SA Generation Pty Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
Direction issued to: AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN at 1700 hrs 06/08/2024
Type of resource: generating unit
Required actions: synchronise and follow dispatch targets at 1030 hrs 07/08/2024
Services provided: Voltage Control
Circumstances necessitating the Direction: Voltage
Circumstances necessitating the Direction additional detail: intervention is required to maintain the power system in a secure operating state
Expected duration: 1430 hrs 07/08/2024
AGL SA Generation Pty Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.
Manager NEM Real Time Operations
Update - Foreseeable AEMO intervention in SA region
Update - Foreseeable AEMO intervention in SA region
Refer AEMO Electricity Market Notice 117566
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 1030 hrs 07/08/2024.
The foreseeable circumstance requiring the need for intervention is Voltage.
AEMO estimates that, in the absence of sufficient market response by 1700 hrs 06/08/2024, AEMO may need to intervene by issuing a direction.
Manager NEM Real Time Operations
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 1030 hrs 07/08/2024.
The foreseeable circumstance requiring the need for intervention is Voltage.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 05/08/2024
The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 117561 is cancelled at 1915 hrs 05/08/2024.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 05/08/2024
The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 117548 has been updated at 1815 hrs to the following:
[1.] From 1930 hrs 05/08/2024 to 2130 hrs 05/08/2024.
The forecast capacity reserve requirement is 450 MW.
The minimum capacity reserve available is 386 MW.
Manager NEM Real Time Operations
[EventId:202408051700_review] Prices for interval 05-Aug-2024 17:00 are subject to review
Issued by Australian Energy Market Operator Ltd at 1655 hrs on 5 August 2024
PRICES ARE SUBJECT TO REVIEW for trading interval 05-Aug-2024 17:00.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202408051655_review] Prices for interval 05-Aug-2024 16:55 are subject to review
Issued by Australian Energy Market Operator Ltd at 1650 hrs on 5 August 2024
PRICES ARE SUBJECT TO REVIEW for trading interval 05-Aug-2024 16:55.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202408051650_review] Prices for interval 05-Aug-2024 16:50 are subject to review
Issued by Australian Energy Market Operator Ltd at 1645 hrs on 5 August 2024
PRICES ARE SUBJECT TO REVIEW for trading interval 05-Aug-2024 16:50.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202408051645_review] Prices for interval 05-Aug-2024 16:45 are subject to review
Issued by Australian Energy Market Operator Ltd at 1640 hrs on 5 August 2024
PRICES ARE SUBJECT TO REVIEW for trading interval 05-Aug-2024 16:45.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.