119875MARKET INTERVENTION04/11/2024 04:02:42 PM

Direction - SA region 04/11/2024

AEMO ELECTRICITY MARKET NOTICE

Direction - SA region 04/11/2024

In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).

The issue of the direction commences an AEMO intervention event. AEMO declares all trading intervals during the event to be intervention trading intervals, commencing from the interval ending 1605 hrs on 04/11/2024.

Intervention pricing does not apply to this AEMO intervention event.

AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.


Manager NEM Real Time Operations
     
119873MARKET INTERVENTION04/11/2024 03:14:13 PM

Update - Foreseeable AEMO intervention in SA region

AEMO ELECTRICITY MARKET NOTICE

Update - Foreseeable AEMO intervention in SA region

Refer AEMO Electricity Market Notice 119859

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0700 hrs 05/11/2024.

The foreseeable circumstance requiring the need for intervention is Voltage.

AEMO estimates that, in the absence of sufficient market response by 1600 hrs 04/11/2024, AEMO may need to intervene by issuing a direction.

Manager NEM Real Time Operations
     
119863MARKET INTERVENTION04/11/2024 02:37:24 PM

Forecast Minimum System Load MSL1 condition in the VIC Region on 05/11/2024

AEMO ELECTRICITY MARKET NOTICE
Forecast Minimum System Load MSL1 condition in the VIC Region on 05/11/2024

Update to Market Notice 119743 - AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the VIC on 05/11/2024.

Minimum regional demand is forecast to be 1258 MW at 1300 hrs, and the advisory threshold is:
MSL1 - 1320 MW
MSL2 - 820 MW
MSL3 - 320 MW

The regional demand is forecast to be below the MSL1 threshold for the following period[s]:
From 1200 hrs 05/11/2024 to 1330 hrs 05/11/2024.

Manager NEM Real Time Operations
     
119859MARKET INTERVENTION04/11/2024 01:49:57 PM

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO ELECTRICITY MARKET NOTICE

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0700 hrs 05/11/2024.

The foreseeable circumstance requiring the need for intervention is Voltage.

Manager NEM Real Time Operations
     
119854GENERAL NOTICE04/11/2024 10:58:55 AM

NEM Local Temperature Alerts for QLD from 04 Nov 2024 to 08 Nov 2024

AEMO ELECTRICITY MARKET NOTICE

AEMO's weather service provider has issued forecast temperatures equal to or greater than the NEM Local Temperature Alert Levels for listed weather stations below.

QLD
Dalby Ap (37+ Deg C): 5th Nov, 7th Nov, 8th Nov

The NEM Local Temperature Alert Levels are:

Launceston Ti Tree Bend: 33 Deg C, Dalby Airport: 37 Deg C, for all other selected weather stations: 39 Deg C.

AEMO requests Market Participants to:

1. review the weather forecast in the local area where their generating units / MNSP converter stations are located and,

2. if required, update the available capacity in their dispatch offers or availability submissions consistent with the forecast temperatures.

Further information is available at:

https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-reliability/projected-assessment-of-system-adequacy/nem-local-temperature-alerts

AEMO Operations Planning
     
119848MARKET INTERVENTION04/11/2024 07:58:26 AM

Update Direction - AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE.


Update Direction - AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN

Refer AEMO Electricity Participant Notice 119835

The TORRB4 TORRENS ISLAN direction is now expected to stay in place until 1700 hrs 04/11/2024.

The direction update is issued at 0755 hrs 04/11/2024.

Manager NEM Real Time Operations
     
119847MARKET INTERVENTION04/11/2024 07:57:19 AM

Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE.

Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

Refer AEMO Electricity Participant Notice 119836

The TORRB3 TORRENS ISLAN direction is now expected to stay in place until 1630 hrs 04/11/2024.

The direction update is issued at 0755 hrs 04/11/2024.

Manager NEM Real Time Operations
     
119836MARKET INTERVENTION03/11/2024 09:13:13 PM

Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE.

Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

Refer AEMO Electricity Participant Notice 119831

The TORRB3 TORRENS ISLAN direction is now expected to stay in place until 1700 hrs 04/11/2024.

The direction update is issued at 2115 hrs 03/11/2024.

Manager NEM Real Time Operations
     
119835MARKET INTERVENTION03/11/2024 09:11:53 PM

Update Direction - AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE.


Update Direction - AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN

Refer AEMO Electricity Participant Notice 119832

The TORRB4 TORRENS ISLAN direction is now expected to start at 0900 hrs 04/11/2024.

The direction update is issued at 2115hrs 03/11/2024.

Manager NEM Real Time Operations
     