Filter by category
Filter by Date
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 05/02/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 114181 has been updated at 0930 hrs 03/02/2024 to the following:
[1.] From 1300 hrs 05/02/2024 to 1730 hrs 05/02/2024.
The forecast capacity reserve requirement is 1326 MW.
The minimum capacity reserve available is 693 MW.
[2.] From 1830 hrs 05/02/2024 to 1900 hrs 05/02/2024.
The forecast capacity reserve requirement is 1299 MW.
The minimum capacity reserve available is 1255 MW.
[3.] From 1930 hrs 05/02/2024 to 2000 hrs 05/02/2024.
The forecast capacity reserve requirement is 1303 MW.
The minimum capacity reserve available is 1245 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 05/02/2024
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 114182 is cancelled at 2330 hrs 02/02/2024.
No LOR2 condition is currently forecast in the STPASA period.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 05/02/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:
[1.] From 1830 hrs 05/02/2024 to 1900 hrs 05/02/2024.
The forecast capacity reserve requirement is 870 MW.
The minimum capacity reserve available is 820 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 05/02/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 114167 has been updated at 1930 hrs 02/02/2024 to the following:
[1.] From 1300 hrs 05/02/2024 to 1900 hrs 05/02/2024.
The forecast capacity reserve requirement is 1202 MW.
The minimum capacity reserve available is 682 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
[EventId:202402021920_NRM_QLD1_NSW1_stopped] NEGRES CONSTRAINT NRM_QLD1_NSW1 ceased operating from 02 February 2024 19:20
Issued by Australian Energy Market Operator Ltd at 1920 hrs on 2 February 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 2 February 2024.
Refer to market notice: 114173
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the QLD to NSW directional interconnector.
The negative residue constraint NRM_QLD1_NSW1 ceased operating at 1920 hrs on 2 February 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202402021850_NRM_QLD1_NSW1_started] NEGRES CONSTRAINT NRM_QLD1_NSW1 started operating from 02 February 2024 18:50
Issued by Australian Energy Market Operator Ltd at 1850 hrs on 2 February 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 2 February 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the QLD to NSW directional interconnector.
The negative residue constraint set NRM_QLD1_NSW1 commenced operating from 1850 hrs on 2 February 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
N-Q-MNSP1
NSW1-QLD1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202402021830_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 02 February 2024 18:30
Issued by Australian Energy Market Operator Ltd at 1830 hrs on 2 February 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 2 February 2024.
Refer to market notice: 114168
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1830 hrs on 2 February 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202402021630_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 02 February 2024 16:30
Issued by Australian Energy Market Operator Ltd at 1630 hrs on 2 February 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 2 February 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1630 hrs on 2 February 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 05/02/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 114157 has been updated at 1500 hrs 02/02/2024 to the following:
From 1300 hrs to 1500 hrs 05/02/2024.
The forecast capacity reserve requirement is 1164 MW.
The minimum capacity reserve available is 685 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations