Cancellation of Reclassification of a Non-Credible Contingency Event - QLD region - 30/04/2019
Cancellation of Reclassification of a Non-Credible Contingency Event: Nebo SVC and the Nebo No.2 275/132kV transformer - QLD region - 30/04/2019.
Refer AEMO Electricity Market Notice 68251
Based on advice from the participant, AEMO considers the simultaneous trip of the following elements is no longer reasonably possible. Accordingly its classification has reverted to a non-credible contingency event.
Region: QLD
Equipment: Nebo SVC and the Nebo No.2 275/132kV transformer
Cancellation time: 1315 hrs 16/09/2024
Constraint set(s) revoked: Nil
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region [beginning] on 16/09/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 118282 is cancelled at 1130 hrs 16/09/2024.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 16/09/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:
[1.] From 1830 hrs 16/09/2024 to 1900 hrs 16/09/2024.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 1378 MW.
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 16/09/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 118275 is cancelled at 1500 hrs 15/09/2024.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 17/09/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 118274 has been updated at 1500 hrs 15/09/2024 to the following:
From 1730 hrs 17/09/2024 to 2130 hrs 17/09/2024.
The forecast capacity reserve requirement is 1474 MW.
The minimum capacity reserve available is 1047 MW.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 16/09/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following periods:
From 1800 hrs 16/09/2024 to 2000 hrs 16/09/2024.
The forecast capacity reserve requirement is 1558 MW.
The minimum capacity reserve available is 1423 MW.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 17/09/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 118264 has been updated at 1500 hrs 14/09/2024 to the following:
From 1730 hrs 17/09/2024 to 2030 hrs 17/09/2024.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 1109 MW.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Braemar No2 330 kV / 275 kV Transformer. - QLD region - 14/09/2024
Inter-regional transfer limit variation - Braemar No2 330 kV / 275 kV Transformer. - QLD region - 14/09/2024
At 1320 hrs 14/09/2024 there was a short notice outage of Braemar No2 330 kV / 275 kV Transformer.
The following constraint set(s) invoked at 1320 hrs 14/09/2024
Q-BRTX2
This constraint set(s) contains equations with the following interconnectors on the LHS.
NSW1-QLD1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Armidale - Sapphire 8E 330 KV Line - NSW region - 13/09/2024
Inter-regional transfer limit variation - Armidale - Sapphire 8E 330 KV Line - NSW region - 13/09/2024
A planned outage of Armidale - Sapphire 8E 330 KV Line in the NSW region was scheduled from 1630 hrs 11/09/2024 to 1330 hrs 14/09/2024.
The outage has been completed and Armidale - Sapphire 8E 330 KV Line returned to service at 1600 hrs 13/09/2024
Constraint set(s) revoked: N-ARSR_8E, N-TW_SVC
Manager NEM Real Time Operations