[EventId:202409291820_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 29 September 2024 18:20
Issued by Australian Energy Market Operator Ltd at 1820 hrs on 29 September 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 29 September 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1820 hrs on 29 September 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202409291745_review] Prices for interval 29-Sep-2024 17:45 are subject to review
Issued by Australian Energy Market Operator Ltd at 1740 hrs on 29 September 2024
PRICES ARE SUBJECT TO REVIEW for trading interval 29-Sep-2024 17:45.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202409291740_review] Prices for interval 29-Sep-2024 17:40 are subject to review
Issued by Australian Energy Market Operator Ltd at 1735 hrs on 29 September 2024
PRICES ARE SUBJECT TO REVIEW for trading interval 29-Sep-2024 17:40.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202409291735_review] Prices for interval 29-Sep-2024 17:35 are subject to review
Issued by Australian Energy Market Operator Ltd at 1730 hrs on 29 September 2024
PRICES ARE SUBJECT TO REVIEW for trading interval 29-Sep-2024 17:35.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202409291730_review] Prices for interval 29-Sep-2024 17:30 are subject to review
Issued by Australian Energy Market Operator Ltd at 1725 hrs on 29 September 2024
PRICES ARE SUBJECT TO REVIEW for trading interval 29-Sep-2024 17:30.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202409291725_review] Prices for interval 29-Sep-2024 17:25 are subject to review
Issued by Australian Energy Market Operator Ltd at 1720 hrs on 29 September 2024
PRICES ARE SUBJECT TO REVIEW for trading interval 29-Sep-2024 17:25.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202409291720_review] Prices for interval 29-Sep-2024 17:20 are subject to review
Issued by Australian Energy Market Operator Ltd at 1715 hrs on 29 September 2024
PRICES ARE SUBJECT TO REVIEW for trading interval 29-Sep-2024 17:20.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Refer to Market Notice 118508
Direction is cancelled from: 1730 hrs 29/09/2024
Manager NEM Real Time Operations
Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLA
Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLA
Refer to Market Notice 118455
In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to AGL SA Generation Pty Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
Direction issued to: AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN at 1700 hrs 29/09/2024
Type of resource: generating unit
Required actions: synchronise and follow dispatch targets at 0730 hrs 30/09/2024
Services provided: Voltage Control
Circumstances necessitating the Direction: Voltage
Circumstances necessitating the Direction additional detail: intervention is required to maintain the power system in a secure operating state
Expected duration: 1500 hrs 30/09/2024 / further notice.
AGL SA Generation Pty Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.
Manager NEM Real Time Operations