Filter by category
Filter by Date
Cancellation of the reclassification of a Non-Credible contingency event: Rowville - Yallourn No. 7 220 kV Line and the Rowville - Yallourn No. 8 220 kV Line in VIC due to Lightning.
Cancellation of the reclassification of a Non-Credible contingency event as a Credible contingency event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any Lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: VIC
Lines: Rowville - Yallourn No. 7 220 kV Line and the Rowville - Yallourn No. 8 220 kV Line
Cancellation time: 16:30 hrs 06/11/2024
Constraint set(s) revoked:
V-ROYP78_R_N-2
Refer AEMO Electricity Market Notice 119964
Manager NEM Real Time Operations
[EventId:202411061530_confirmed] Prices for interval 06-Nov-2024 15:30 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1530 hrs on 6 November 2024
PRICES ARE NOW CONFIRMED for trading interval 06-Nov-2024 15:30.
In accordance with Market Notice 120005 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202411061525_confirmed] Prices for interval 06-Nov-2024 15:25 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1530 hrs on 6 November 2024
PRICES ARE NOW CONFIRMED for trading interval 06-Nov-2024 15:25.
In accordance with Market Notice 120003 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202411061520_confirmed] Prices for interval 06-Nov-2024 15:20 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1530 hrs on 6 November 2024
PRICES ARE NOW CONFIRMED for trading interval 06-Nov-2024 15:20.
In accordance with Market Notice 120002 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202411061515_confirmed] Prices for interval 06-Nov-2024 15:15 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1530 hrs on 6 November 2024
PRICES ARE NOW CONFIRMED for trading interval 06-Nov-2024 15:15.
In accordance with Market Notice 120001 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202411061510_confirmed] Prices for interval 06-Nov-2024 15:10 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1530 hrs on 6 November 2024
PRICES ARE NOW CONFIRMED for trading interval 06-Nov-2024 15:10.
In accordance with Market Notice 119999 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202411061505_confirmed] Prices for interval 06-Nov-2024 15:05 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1530 hrs on 6 November 2024
PRICES ARE NOW CONFIRMED for trading interval 06-Nov-2024 15:05.
In accordance with Market Notice 119998 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
Reclassification of a Non-Credible Contingency Event: Armidale - Dumaresq 8C 330kV line and Armidale - Sapphire WF 8E 330kV line in NSW1 due to Lightning.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: NSW1
Lines: Armidale - Dumaresq 8C 330kV and Armidale - Sapphire WF 8E 330kV
Duration: 06/11/2024 14:55 until further notice
Constraint set(s) invoked:
N-ARDM_ARSR_1PH_N-2 Constraint set contains the following interconnector(s) on the left hand side:
N-Q-MNSP1
NSW1-QLD1
Auto-generated on behalf of Manager NEM Real Time Operations
Forecast Minimum System Load 1 (MSL1) condition in the VIC region on 10/11/2024
Update to Market Notice 119920 - AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the VIC region on 10/11/2024.
Minimum System Load (MSL) conditions are forecast when regional demand is less than the relevant MSL threshold. The advisory MSL thresholds are:
o MSL1 - 1745 MW
o MSL2 - 1245 MW
o MSL3 - 745 MW
The regional demand is forecast to be below the MSL1 threshold for the following period:
1. From 1230 hrs to 1330 hrs 10/11/2024. Minimum regional demand is forecast to be 1719 MW at 1300 hrs.
Forecast regional demand (DEMAND50) is published in Short Term and Pre-Dispatch PASA region solution reports available on Market Data NEMWEB: https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/data-nem/market-data-nemweb .
AEMO Operations