STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 29/02/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 115190 has been updated at 0700 hrs 27/02/2024 to the following:
From 1500 hrs to 2100 hrs 29/02/2024.
The forecast capacity reserve requirement is 1318 MW.
The minimum capacity reserve available is 264 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 29/02/2024
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 115191 is cancelled at 0700 hrs 27/02/2024.
AEMO Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 29/02/2024
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 115183 has been updated at 0440 hrs 27/02/2024 to the following:
[1.] From 1730 hrs 29/02/2024 to 2000 hrs 29/02/2024.
The forecast capacity reserve requirement is 729 MW.
The minimum capacity reserve available is 364 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 29/02/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 115181 has been updated at 0440 hrs 27/02/2024 to the following:
[1.] From 1500 hrs 29/02/2024 to 2000 hrs 29/02/2024.
The forecast capacity reserve requirement is 1250 MW.
The minimum capacity reserve available is 272 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 29/02/2024
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 115153 has been updated at 2145 hrs 26/02/2024 to the following:
[1.] From 1700 hrs 29/02/2024 to 2000 hrs 29/02/2024.
The forecast capacity reserve requirement is 870 MW.
The minimum capacity reserve available is 373 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 29/02/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 115157 has been updated at 2140 hrs 26/02/2024 to the following:
[1.] From 1430 hrs 29/02/2024 to 2000 hrs 29/02/2024.
The forecast capacity reserve requirement is 1316 MW.
The minimum capacity reserve available is 0 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
[EventId:202402261900_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 26 February 2024 19:00
Issued by Australian Energy Market Operator Ltd at 1900 hrs on 26 February 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 26 February 2024.
Refer to market notice: 115162
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1900 hrs on 26 February 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202402261850_NRM_QLD1_NSW1_stopped] NEGRES CONSTRAINT NRM_QLD1_NSW1 ceased operating from 26 February 2024 18:50
Issued by Australian Energy Market Operator Ltd at 1850 hrs on 26 February 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 26 February 2024.
Refer to market notice: 115163
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the QLD to NSW directional interconnector.
The negative residue constraint NRM_QLD1_NSW1 ceased operating at 1850 hrs on 26 February 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202402261745_NRM_QLD1_NSW1_started] NEGRES CONSTRAINT NRM_QLD1_NSW1 started operating from 26 February 2024 17:45
Issued by Australian Energy Market Operator Ltd at 1746 hrs on 26 February 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 26 February 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the QLD to NSW directional interconnector.
The negative residue constraint set NRM_QLD1_NSW1 commenced operating from 1745 hrs on 26 February 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
N-Q-MNSP1
NSW1-QLD1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.