[EventId:202402131450_NRM_VIC1_NSW1_started] NEGRES CONSTRAINT NRM_VIC1_NSW1 started operating from 13 February 2024 14:50
Issued by Australian Energy Market Operator Ltd at 1450 hrs on 13 February 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to NSW - 13 February 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to NSW directional interconnector.
The negative residue constraint set NRM_VIC1_NSW1 commenced operating from 1450 hrs on 13 February 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202402131330_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 13 February 2024 13:30
Issued by Australian Energy Market Operator Ltd at 1330 hrs on 13 February 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 13 February 2024.
Refer to market notice: 114574
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.
The negative residue constraint NRM_VIC1_SA1 ceased operating at 1330 hrs on 13 February 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202402131235_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 13 February 2024 12:35
Issued by Australian Energy Market Operator Ltd at 1235 hrs on 13 February 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 13 February 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.
The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1235 hrs on 13 February 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 13/02/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 114532 is cancelled at 1613 hrs 12/02/2024.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 13/02/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:
[1.] From 1630 hrs 13/02/2024 to 1900 hrs 13/02/2024.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 1097 MW.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region [beginning] on 12/02/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 114519 is cancelled at 0910 hrs 12/02/2024.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 12/02/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:
[1.] From 1730 hrs 12/02/2024 to 1800 hrs 12/02/2024.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 1389 MW.
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 13/02/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 114502 is cancelled at 1500 hrs 12/02/2024
[No LOR 1 condition is currently forecast in the STPASA period.]
Manager NEM RTO
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 13/02/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 114472 has been updated at 1430 hrs 11/02/2024 to the following:
[1.] From 1530 hrs 13/02/2024 to 1600 hrs 13/02/2024.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 1281 MW.
[2.] From 1630 hrs 13/02/2024 to 1730 hrs 13/02/2024.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 1320 MW.
Manager NEM Real Time Operations