114211RESERVE NOTICE03/02/2024 02:37:35 PM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 06/02/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 114160 is cancelled at 1400 hrs 03/02/2024.

Manager NEM Real Time Operations
114209RESERVE NOTICE03/02/2024 02:33:04 PM

STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 05/02/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 114159 has been updated at 1400 hrs 03/02/2024 to the following:

From 1830 hrs 05/02/2024 to 1900 hrs 05/02/2024.
The forecast capacity reserve requirement is 1265 MW.
The minimum capacity reserve available is 1182 MW.

Manager NEM Real Time Operations
114208RESERVE NOTICE03/02/2024 02:32:01 PM

STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 06/02/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 114158 has been updated at 1400 hrs 03/02/2024 to the following:

From 1830 hrs 05/02/2024 to 1900 hrs 05/02/2024.
The forecast capacity reserve requirement is 1265 MW.
The minimum capacity reserve available is 1182 MW.

Manager NEM Real Time Operations
114207RESERVE NOTICE03/02/2024 02:26:32 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 04/02/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 114202 has been updated at 1400 hrs to the following:

From 1730 hrs 04/02/2024 to 1900 hrs 04/02/2024.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 1126 MW.

Manager NEM Real Time Operations
114204SETTLEMENTS RESIDUE03/02/2024 02:05:19 PM

[EventId:202402031405_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 03 February 2024 14:05

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1405 hrs on 3 February 2024

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 3 February 2024.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1405 hrs on 3 February 2024.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
114202RESERVE NOTICE03/02/2024 01:36:25 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 04/02/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:

[1.] From 1830 hrs 04/02/2024 to 1900 hrs 04/02/2024.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 1287 MW.


Manager NEM Real Time Operations
114195SETTLEMENTS RESIDUE03/02/2024 11:30:28 AM

[EventId:202402031130_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 03 February 2024 11:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1130 hrs on 3 February 2024

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 3 February 2024.

Refer to market notice: 114194

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1130 hrs on 3 February 2024.

This is an AEMO autogenerated Market Notice.
114194SETTLEMENTS RESIDUE03/02/2024 10:05:22 AM

[EventId:202402031005_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 03 February 2024 10:05

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1005 hrs on 3 February 2024

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 3 February 2024.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1005 hrs on 3 February 2024.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
114180SETTLEMENTS RESIDUE02/02/2024 07:20:17 PM

[EventId:202402021920_NRM_QLD1_NSW1_stopped] NEGRES CONSTRAINT NRM_QLD1_NSW1 ceased operating from 02 February 2024 19:20

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1920 hrs on 2 February 2024

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 2 February 2024.

Refer to market notice: 114173

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the QLD to NSW directional interconnector.

The negative residue constraint NRM_QLD1_NSW1 ceased operating at 1920 hrs on 2 February 2024.

This is an AEMO autogenerated Market Notice.