117473MARKET INTERVENTION26/07/2024 03:41:41 PM

Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE

Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

Refer to Market Notice 117463

Direction is cancelled from: 1530 hrs 26/07/2024

Manager NEM Real Time Operations
     
117470MARKET INTERVENTION26/07/2024 04:00:49 PM

Direction - SA region 26/07/2024

AEMO ELECTRICITY MARKET NOTICE

Direction - SA region 26/07/2024

Refer to Market Notice 117469


In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to AGL SA Generation Pty Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).

Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN at 1600 hrs 26/07/2024
Type of resource: generating unit
Required actions: synchronise and follow dispatch targets at 0930 hrs 27/07/2024
Services provided: Voltage Control
Circumstances necessitating the Direction: Voltage
Circumstances necessitating the Direction additional detail: intervention is required to maintain the power system in a secure operating state
Expected duration: 1430 hrs 27/07/2024

AGL SA Generation Pty Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.

Manager NEM Real Time Operations
     
117469MARKET INTERVENTION26/07/2024 03:09:13 PM

Update - Foreseeable AEMO intervention in SA region

AEMO ELECTRICITY MARKET NOTICE

Update - Foreseeable AEMO intervention in SA region

Refer AEMO Electricity Market Notice 117465

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0000 hrs 27/07/2024.

The foreseeable circumstance requiring the need for intervention is Voltage.

AEMO estimates that, in the absence of sufficient market response by 1600 hrs 26/07/2024, AEMO may need to intervene by issuing a direction.

Manager NEM Real Time Operations
     
117468RESERVE NOTICE26/07/2024 03:02:08 PM

STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the TAS Region on 30/07/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the TAS region for the following period:

From 0730 hrs to 0900 hrs 30/07/2024.
The forecast capacity reserve requirement is 555 MW.
The minimum capacity reserve available is 537 MW.

AEMO Operations
     
117467RESERVE NOTICE26/07/2024 03:15:15 PM

STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the TAS Region on 29/07/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the TAS region advised in AEMO Electricity Market Notice No. 117442 has been updated at 1400 hrs 26/07/2024 to the following:

From 0700 hrs to 0930 hrs 29/07/2024.
The forecast capacity reserve requirement is 555 MW.
The minimum capacity reserve available is 461 MW.

AEMO Operations
     
117465MARKET INTERVENTION26/07/2024 01:01:31 PM

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO ELECTRICITY MARKET NOTICE

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0000 hrs 27/07/2024.

The foreseeable circumstance requiring the need for intervention is Voltage.

Manager NEM Real Time Operations
     
117464MARKET INTERVENTION26/07/2024 12:25:11 PM

Update Direction - AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE.

Update Direction - AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN

Refer AEMO Electricity Market Notice 117446

The TORRB4 TORRENS ISLAN direction is now expected to stay in place until 1700 hrs 26/07/2024.

The direction update is issued at 1220 hrs 26/07/2024.

Manager NEM Real Time Operations
     
117463MARKET INTERVENTION26/07/2024 12:23:36 PM

Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE.

Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

Refer AEMO Electricity Market Notice 117460

The TORRB3 TORRENS ISLAN direction is now expected to stay in place until 1530 hrs 26/07/2024.

The direction update is issued at 1220 hrs 26/07/2024.

Manager NEM Real Time Operations
     
117460MARKET INTERVENTION26/07/2024 06:44:31 AM

Update Direction - SA region 25/07/2024

AEMO ELECTRICITY MARKET NOTICE

Update Direction - SA region 25/07/2024

Refer to Market Notice 117445

In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to AGL SA Generation Pty Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).

Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN at 0645 hrs 26/07/2024
Type of resource: generating unit
Required actions: synchronise and follow dispatch targets at 0900 hrs 26/07/2024
Services provided: Voltage Control
Circumstances necessitating the Direction: Voltage
Circumstances necessitating the Direction additional detail: intervention is required to maintain the power system in a secure operating state
Expected duration: 1700 hrs 26/07/2024

AGL SA Generation Pty Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.