118401RESERVE NOTICE23/09/2024 01:26:46 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 23/09/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 118396 has been updated at 1315 hrs to the following:

From 1930 hrs 23/09/2024 to 2100 hrs 23/09/2024.
The forecast capacity reserve requirement is 537 MW.
The minimum capacity reserve available is 443 MW.




Manager NEM Real Time Operations
     
118400MARKET INTERVENTION23/09/2024 01:13:51 PM

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO ELECTRICITY MARKET NOTICE

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0000 hrs 24/09/2024.

The foreseeable circumstance requiring the need for intervention is Voltage.

Manager NEM Real Time Operations
     
118399RESERVE NOTICE23/09/2024 01:02:35 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 24/09/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following periods:

From 1730 hrs 24/09/2024 to 2130 hrs 24/09/2024.
The forecast capacity reserve requirement is 600 MW.
The minimum capacity reserve available is 382 MW.


Manager NEM Real Time Operations
     
118397MARKET INTERVENTION23/09/2024 12:46:38 PM

Update Direction - AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE.

Update Direction - AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN

Refer AEMO Electricity Participant Notice 118372

The TORRB4 TORRENS ISLAN direction is now expected to stay in place until 1530 hrs 23/09/2024.

The direction update is issued at 1240 hrs 23/09/2024.

Manager NEM Real Time Operations
     
118396RESERVE NOTICE23/09/2024 12:24:36 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 23/09/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 118395 has been updated at 1220 hrs to the following:

From 2000 hrs 23/09/2024 to 2030 hrs 23/09/2024.
The forecast capacity reserve requirement is 600 MW.
The minimum capacity reserve available is 552 MW.




Manager NEM Real Time Operations
     
118395RESERVE NOTICE23/09/2024 10:19:53 AM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 23/09/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 118392 has been updated at 1020 hrs to the following:

From 1830 hrs 23/09/2024 to 2200 hrs 23/09/2024.
The forecast capacity reserve requirement is 600 MW.
The minimum capacity reserve available is 450 MW.


Manager NEM Real Time Operations
     
118392RESERVE NOTICE23/09/2024 07:27:49 AM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 23/09/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 118374 has been updated at 0720 hrs to the following:

From 1800 hrs 23/09/2024 to 2230 hrs 23/09/2024.
The forecast capacity reserve requirement is 600 MW.
The minimum capacity reserve available is 523 MW.


Manager NEM Real Time Operations
     
118389NON-CONFORMANCE23/09/2024 05:45:14 AM

NON-CONFORMANCE Region QLD1 Monday, 23 September 2024

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE QLD1 Region Monday, 23 September 2024

AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:

Unit: W/HOE#2
Duration: 23/09/2024 05:30 to 23/09/2024 05:45
Amount: -165 MW
Constraint: NC-Q_W/HOE#2

Auto-generated on behalf of Manager NEM Real Time Operations
     
118379MARKET INTERVENTION23/09/2024 03:59:18 AM

Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT

AEMO ELECTRICITY MARKET NOTICE

Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT

Refer to Market Notice 118386

Direction is cancelled from: 0400 hrs 23/09/2024

Manager NEM Real Time Operations
     