CHG0099235 | Completed | Production | Migrate Pre-Production (PPD) VLAN 108 Gateway in Norwest from the Old Core Switches to the New Core Switches.
Notification issued to: Market Notice
Notification Type: Completed
Change Type: Normal
Service/Component: Local Area Network
Change Title: Migrate Pre-Production (PPD) VLAN 108 Gateway in Norwest from the Old Core Switches to the New Core Switches.
Support Information: Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 24/10/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 119211 has been updated at 1400 hrs to the following:
[1.] From 1800 hrs 24/10/2024 to 2030 hrs 24/10/2024.
The forecast capacity reserve requirement is 1420 MW.
The minimum capacity reserve available is 1209 MW.
Manager NEM Real Time Operations
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Refer to Market Notice 119265
Direction is cancelled from: 1830 hrs 24/10/2024
Manager NEM Real Time Operations
Cancellation - AEMO Intervention Event - VIC region 24/10/2024
Cancellation - AEMO Intervention Event - VIC region 24/10/2024
Refer to Market Notice 119272
The AEMO Intervention Event and all associated directions are cancelled from 1535 hrs on 24/10/2024.
Manager NEM Real Time Operations
Cancellation: Direction issued to: Snowy Hydro Limited - MURR2-3 MURRAY2
Cancellation: Direction issued to: Snowy Hydro Limited - MURR2-3 MURRAY2
Refer to Market Notice 119293
Direction is cancelled from: 1535 hrs 24/10/2024
Manager NEM Real Time Operations
Cancellation: Direction issued to: Snowy Hydro Limited - MURR2-2 MURRAY2
Cancellation: Direction issued to: Snowy Hydro Limited - MURR2-2 MURRAY2
Refer to Market Notice 119292
Direction is cancelled from: 1535 hrs 24/10/2024
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 28/10/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:
From 1800 hrs to 1900 hrs 28/10/2024.
The forecast capacity reserve requirement is 607 MW.
The minimum capacity reserve available is 517 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
[EventId:202410241310_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 24 October 2024 13:10
Issued by Australian Energy Market Operator Ltd at 1310 hrs on 24 October 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 24 October 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1310 hrs on 24 October 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202410241300_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 24 October 2024 13:00
Issued by Australian Energy Market Operator Ltd at 1300 hrs on 24 October 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 24 October 2024.
Refer to market notice: 119295
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1300 hrs on 24 October 2024.
This is an AEMO autogenerated Market Notice.