116141RECLASSIFY CONTINGENCY15/04/2024 05:50:05 PM

Reclassification of a Non-Credible Contingency Event: Ross ? Tully South No.8905/1 275 kV line line and Cardwell ? Tully No.7389 132kV line line in QLD1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: QLD1

Lines: Ross ? Tully South No.8905/1 275 kV line and Cardwell ? Tully No.7389 132kV line

Duration: 15/04/2024 17:49 until further notice

Constraint set(s) invoked:
NONE

Auto-generated on behalf of Manager NEM Real Time Operations
116140INTER-REGIONAL TRANSFER15/04/2024 04:59:01 PM

Inter-regional transfer limit variation - Tamworth No1 SVC Protection system- NSW region - 15/04/2024

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Tamworth No1 SVC Protection system - NSW region - 15/04/2024

At 1635 hrs 15/04/2024 there was a short notice outage of Tamworth No1 SVC protection system.

The following constraint set(s) invoked at 1650 hrs 15/04/2024
N-TW_SVC

This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1,NSW1-QLD1

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations
116139MARKET INTERVENTION15/04/2024 03:25:18 PM

Cancellation - AEMO Intervention Event - Intervention trading intervals - Direction SA region 15/04/2024 Event 2

AEMO ELECTRICITY MARKET NOTICE

Cancellation - AEMO Intervention Event - Intervention trading intervals - Direction SA region 15/04/2024 Event 2

Refer Market Notice 116135

The AEMO Intervention Event and all associated directions are cancelled from 1530 hrs 15/04/2024

Manager NEM Real Time Operations
116137MARKET INTERVENTION15/04/2024 01:49:41 PM

Update - Possible intervention to manage power system security in SA region

AEMO ELECTRICITY MARKET NOTICE

Update - Possible intervention to manage power system security in SA region

Refer AEMO Electricity Market Notice 116131

The synchronous generating units currently expected to be synchronised in SA from 1030 hrs 16/04/2024 will be inadequate to maintain a secure operating state in SA .

AEMO estimates that, in the absence of sufficient market response by 1430 hrs 15/04/2024, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.

Manager NEM Real Time Operations
116136RESERVE NOTICE16/04/2024 10:54:52 AM

RESERVE NOTICE MT PASA PUBLICATION 16 April 2024

The MTPASA result published on 16 April 2024 identifies Low Reserve Conditions as annual unserved energy exceeds the Reliability Standard between:
-- April 2025 - April 2026 in New South Wales.

This weeks MT PASA has been updated to be consistent with the Generation Information published on 16 April 2024. This includes the application of default delays to all projects as per AEMOs methodology.

AEMO declares low reserve conditions in accordance with clause 4.8.4 of the National Electricity Rules for the following region(s) and periods:
-- November 2025 - March 2026 in New South Wales when forecast demand exceeds supply under some circumstances.

Please note that MTPASA informs the market of potential reliability issues to allow the market to respond in the first instance, potentially avoiding the need for any AEMO intervention.

For further information, please refer to:
https://www.aemo.com.au/Electricity/National-Electricity-Market-NEM/Data/Market-Management-System-MMS/Projected-Assessment-of-System-Adequacy

This notice supersedes Market Notice 116053 published on 9 April 2024.

Background
As part of a broader process of implementing the reliability standard, AEMO runs the Medium Term Projected Assessment of System Adequacy (MTPASA) process weekly to forecast expected unserved energy levels over a two year period. If the expected annual unserved energy exceeds the maximum level specified by the Reliability Standard, a Low Reserve Condition is identified.

For more information about how AEMO implements the reliability standard, please view the Reliability Standard Implementation Guidelines (RSIG) available on AEMO's website at https://www.aemo.com.au/Electricity/National

Forecasting
AEMO
116135MARKET INTERVENTION15/04/2024 02:26:43 PM

Direction - SA region 15/04/2024 Event 2

AEMO ELECTRICITY MARKET NOTICE.

Direction - SA region 15/04/2024 Event 2

In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a).

The direction was necessary to maintain the power system in a secure operating state.

AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.

The issue of the direction commences an AEMO intervention event. AEMO declares all trading intervals during the event to be intervention trading intervals, commencing from the interval ending 1435 hrs on 15/04/2024.

Intervention pricing does not apply to this AEMO intervention event.

Manager NEM Real Time Operations
116133MARKET INTERVENTION15/04/2024 02:25:38 PM

Cancellation - AEMO Intervention Event - Intervention trading intervals - Direction SA region 15/04/2024

AEMO ELECTRICITY MARKET NOTICE

Cancellation - AEMO Intervention Event - Intervention trading intervals - Direction SA region 15/04/2024

Refer Market Notice 116124

The AEMO Intervention Event and all associated directions are cancelled from 1430 hrs 15/04/2024

Manager NEM Real Time Operations
116131MARKET INTERVENTION15/04/2024 12:39:39 PM

Update - Possible intervention to manage power system security in SA region

AEMO ELECTRICITY MARKET NOTICE

Update - Possible intervention to manage power system security in SA region

Refer AEMO Electricity Market Notice 116126

The synchronous generating units currently expected to be synchronised in SA from 0900 hrs 16/04/2024 will be inadequate to maintain a secure operating state in SA .

AEMO estimates that, in the absence of sufficient market response by 1400 hrs 15/04/2024, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.

Manager NEM Real Time Operations
116130INTER-REGIONAL TRANSFER15/04/2024 12:08:58 PM

Inter-regional transfer limit variation - Tamworth No1 SVC - NSW region - 15/04/2024

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Tamworth No1 SVC - NSW region - 15/04/2024

At 1155 hrs 15/04/2024 there was an unplanned outage of Tamworth No1 SVC.

The following constraint set(s) invoked at 1200 hrs 15/04/2024
N-TW_SVC

This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1,NSW1-QLD1

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations