Power system reclassification events
A number of reviewable incidents may result from or result in AEMO reclassifying a non-credible contingency as a credible contingency. In accordance with Clause 4.2.3A(i) of the NER AEMO is required to report on the reasons for all decisions to reclassify contingencies.