CHG0039699: Planned System Outage - QLD Internet link maintenance
Notification issued to: Market Notice
Notification Type: Initial
Change Type: Normal
Service/ Component: Wide Area Network
Change Title: Planned System Outage - QLD Internet link maintenance
Change Start Date & Time: 01/07/2016 10:00:00 AEST
Change End Date & Time: 01/07/2016 11:00:00 AEST
Outage Start Date & Time: 01/07/2016 10:00:00 AEST
Outage End Date & Time: 01/07/2016 11:00:00 AEST
Change Description:
The AEMO QLD data center internet telecommunications service will experience an outage as part of an upgraded to this service.
Environment: Production
Participant Impact and Requirements:
The following impacts are expected to participant connectivity during this planned outage:
IPWAN Participants - IPWAN Participants - Nil
Lan-2-Lan VPN Participants - Upto 1 x 10 minutes to participants whom have established their VPN connection/s via the AEMO QLD datacenter termination point (202.44.76.10)
Note: Participants are encouraged to ensure their VPN connections are already established or are configured (as per AEMO best practice) to automatically failover to the alternate AEMO NSW datacenter termination point (202.44.78.10) prior to this scheduled outage.
Remote Access VPN Participants - Upto 1 x 10 minutes to participants who utilise an AEMO RSA token and the AEMO VPN client software to establish their VPN via the AEMO QLD datacenter VPN termination point (202.44.76.8)
Note: Participants are encouraged to establish their VPN client software connections via the alternate AEMO NSW datacenter VPN endpoint (2
CHG0039748: Plannned System Maintenance on Market Settlement and Transfer Solutions (MSATS)
Notification issued to: Market Notice
Notification Type: Initial
Service/ Component: Market Settlement and Transfer Solutions (MSATS)
Change Title: Plannned System Maintenance on Market Settlement and Transfer Solutions (MSATS)
Change Start Date & Time: 06/07/2016 17:30:00 AEST
Change End Date & Time: 06/07/2016 19:30:00 AEST
Outage Start Date & Time: 06/07/2016 17:30:00 AEST
Outage End Date & Time: 06/07/2016 19:30:00 AEST
Change Description:
Electricity MSATS Production Site Transfer (NSW to QLD Site) will be carried out to allow maintenance work on the alternate site.
Environment: Production
Participant Impact and Requirements:
Awareness of this outage. Access to all parts of the MSATS system may be interrupted during the outage period. Access should be attempted outside these times.
Support Information:
Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
*Change times specified are in AEST
Cancellation of the Reclassification of a Non-Credible Contingency Event: Rowville - Yallourn No.5 & No.6 220 kV Lines in Victoria due to Lightning.
Cancellation of the Reclassification of a Non-Credible Contingency Event: Rowville - Yallourn No.5 & No.6 220 kV Lines in Victoria due to Lightning.
Refer AEMO Electricity Market Notice 54126
There is no longer any lightning activity in the vicinity of the Rowville - Yallourn No.5 & No.6 220 kV Lines.
AEMO has cancelled the reclassification of the simultaneous trip of those circuits as a credible contingency event at 1500 hrs.
Constraint Set
V-ROYP56_R_N-2 revoked.
Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Rowville - Yallourn No.5 & No.6 220 kV Lines in Victoria due to Lightning.
Reclassification of a Non-Credible Contingency Event: Rowville - Yallourn No.5 & No.6 220 kV Lines in Victoria due to Lightning.
Lightning is occurring near the Rowville - Yallourn No.5 & No.6 220 kV Lines.
AEMO considers the simultaneous trip of those circuits to now be more likely.
Therefore AEMO has reclassified this as a credible contingency event from 1425 hrs 24/06/16 until further notice.
Constraint Set
V-ROYP56_R_N-2 invoked.
Manager NEM Real Time Operations
Cancellation of the Reclassification of a Non-Credible Contingency Event: Eildon - Mt. Beauty No. 1 and No. 2 220 kV Lines in Victoria due to Lightning.
Cancellation of the Reclassification of a Non-Credible Contingency Event: Eildon - Mt. Beauty No. 1 and No. 2 220 kV Lines in Victoria due to Lightning.
Refer AEMO Electricity Market Notice 54120
There is no longer any lightning activity in the vicinity of the Eildon - Mt. Beauty No. 1 and No. 2 220 kV Lines.
AEMO has cancelled the reclassification of the simultaneous trip of those circuits as a credible contingency event at 0030 hrs.
Manager NEM Real Time Operations
Cancellation of the Reclassification of a Non-Credible Contingency Event: Dederang - Glenrowan No.1 and No.3 220 kV Lines in Victoria due to Lightning.
Cancellation of the Reclassification of a Non-Credible Contingency Event: Dederang - Glenrowan No.1 and No.3 220 kV Lines in Victoria due to Lightning.
Refer AEMO Electricity Market Notice 54119
There is no longer any lightning activity in the vicinity of the Dederang - Glenrowan No.1 and No.3 220 kV Lines.
AEMO has cancelled the reclassification of the simultaneous trip of those circuits as a credible contingency event at 0030 hrs.
Constraint Set V-DDGN_N-2 revoked.
Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Eildon - Mt. Beauty No. 1 and No. 2 220 kV Lines in Victoria due to Lightning.
Reclassification of a Non-Credible Contingency Event: Eildon - Mt. Beauty No. 1 and No. 2 220 kV Lines in Victoria due to Lightning.
Lightning is occurring near the Eildon - Mt. Beauty No. 1 and No. 2 220 kV Lines.
AEMO considers the simultaneous trip of those circuits to now be more likely.
Therefore AEMO has reclassified this as a credible contingency event 2305 hrs 23/06/16 until further notice.
Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Dederang - Glenrowan No. 1 and No. 3 220 kV Lines in Victoria due to Lightning.
Reclassification of a Non-Credible Contingency Event: Dederang - Glenrowan No. 1 and No. 3 220 kV Lines in Victoria due to Lightning.
Lightning is occurring near the Dederang - Glenrowan No. 1 and No. 3 220 kV Lines.
AEMO considers the simultaneous trip of those circuits to now be more likely.
Therefore AEMO has reclassified this as a credible contingency event from 2250 hrs 23/06/16 until further notice.
Constraint Set V-DDGN_N-2 invoked.
This Constraint Set contains equations with the following interconnectors on the LHS.
V-S-MNSP1
V-SA
VIC1-NSW1
Manager NEM Real Time Operations
Cancellation of the Reclassification of a Non-Credible Contingency Event: Burnie - Sheffield No.2 110 kV and Sheffield - Paloona - Ulverstone 110 kV Lines in Tasmania due to Lightning.
Cancellation of the Reclassification of a Non-Credible Contingency Event: Burnie - Sheffield No.2 110 kV and Sheffield - Paloona - Ulverstone 110 kV Lines in Tasmania due to Lightning.
Refer AEMO Electricity Market Notice 54075
There is no longer any lightning activity in the vicinity of the Burnie - Sheffield No.2 110 kV and Sheffield - Paloona - Ulverstone 110 kV Lines.
AEMO has cancelled the reclassification of the simultaneous trip of those circuits as a credible contingency event at 0935 hrs.
Manager NEM Real Time Operations